Weekly Summary Nanosat 5. Spring Semester 29 April 2008 Mike Legatt. Last Week. AFRL CDR and Reports!!!!!!!!!!! Structural feedback Excellent work –
E N D
Weekly SummaryNanosat 5 Spring Semester 29 April 2008 Mike Legatt
Last Week • AFRL CDR and Reports!!!!!!!!!!! • Structural feedback • Excellent work – • “Consider putting the battery box on the bottom, not the top. If you put it on top, you make the structure do something you don’t want it to do.” • “Don’t need to use so many nodes.” • Chasing the convergence • More sims in progress • Thermal feedback • “In general, the analysis lines up ‘very well’ with others seen before.” • Use SINDA/Thermal Desktop • Radio RF powers loss vs. thermal power loss • We have many nodes.
Next Week • General • Prepare for FDR • Structural • Create a structural analysis handbook for subsequent Nanosat teams • Report revisions • Thermal • Create a thermal analysis handbook for subsequent Nanosat Teams • Use student version of ANSYS with reduced nodes • Report revisions
Outstanding Issues General -ANSYS license expires 30 April 2008 -update reports as necessary -exit interviews Structural -continue to run sims and make structural modifications to ensure the satellite meets all AFRL structural requirements -all structural requirements now fulfilled Thermal -cold case sims -take into account thermal control issues since ANSYS license expires
Future Work • Possible satellite attitude effects on temperature extremes • Thermal control methods (fins, coatings, etc) • Component relocations • Mesh refinement for convergence verification