1 / 3

JAR OPS3 NPA 38 Performance Class 2 with exposure

JAR OPS3 NPA 38 Performance Class 2 with exposure. JAR OPS3-517 status of the modification process.

Download Presentation

JAR OPS3 NPA 38 Performance Class 2 with exposure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JAR OPS3 NPA 38Performance Class 2 with exposure

  2. JAR OPS3-517 status of the modification process • Since three years a lot of work has been performed within HSC to modify OPS3-517 in order to make demonstration work for operations with exposure acceptable by Authorities, Operators and Manufacturers. • Through NPA 38 OPS3-517 and associated Appendix and AMJ has been deeply modified in order to reach an HSC agreement (agreement achieved in Las Vegas meeting 02/2004)

  3. JAR OPS3-517 (b) : alleviation to 3-517(a) • After 31 March 2005 operations with exposure under 3-517 (b)(at amendment 3) (alleviation to 3-517(a)) will no more be authorized. • Nevertheless the reason why the modification process of OPS3-517 was engaged three years ago (see previous slide) remains. • There is a high risk of blocking, due to the fact that NPA38 is not already transfered in the rule • Proposal to come out of this dead end: • 1/ Use NPA38: • as an equivalent safety to OPS3-517 (at amendment 3), should be acceptable by all the parties because it is the result of an internal HSC agreement, • give NPA38 an “official existence” (by putting it on OST agenda very very soon ?) • 2/ Postponed 31 March 2005 deadline • Note: first proposal will give enough “official” existence to NPA 38 to guarantee that it will be taken into-account by EASA in the writing process of OPS IR

More Related