1 / 4

Straw electronics status

Straw electronics status. SRB Layout Components Plans DAQ - Vito Services Power supplies cabling. SRB layout. SRB. Layout progressing very well Majority of components ordered The worst delivery time FPGA and QDR end of July Still to order components for few kCHF Available on stock

Download Presentation

Straw electronics status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Straw electronics status • SRB • Layout • Components • Plans • DAQ - Vito • Services • Power supplies • cabling

  2. SRB layout

  3. SRB • Layout progressing very well • Majority of components ordered • The worst delivery time • FPGA and QDR end of July • Still to order components for few kCHF • Available on stock • Prototyping and production • Order extra FPGAs for prototype • Prototypes order mid June, request for PCB offers next week • Testing middle of July -> end of July • End of July we should have all components for full production • PCB production • As we are late, I propose to do all the PCB production ASAP • ~5 prototypes fast track, 45 normal (50 total, with 90% yield we have 40/45 needed) • In case of problem with design we loose PCBs (few 10kCHF) • Full production starts beginning of August • Delivery middle September

  4. Services • MPOD • Delayed • Problem with HV modules • Wiener proposed to lend us 8 channel HV modules till ours are delivered • Should be at CERN now (but no sign of it) • Cabling (Johan) • All LV cables for chambers produced • RJ45 cables for the first chamber ordered and the installation should start this week • LV PP problem with fuses • Nominal current 0.65A; fuse 1A breaks during power-up • Change fuses to 2A, limit inrush current at MPOD • Move old SRB from lab and/or prototype to ECN3 for testing • Connectivity • Noise • Cosmics ???

More Related