The THEMIS ground based observatory network progress report.
E N D
The THEMIS ground based observatory network progress report. S.B. Mende1, H.U. Frey1, V. Angelopoulos1, E. Donovan2, B. Jackel2, M. Greffen21Space Sciences Laboratory, University of California, Berkeley, CA 94720, USA2University of Calgary, 2500 University Drive N.W., Calgary, Alberta T2N 1N4, Canadae-mail: mende@ssl.berkeley.edu
Outline: Current THEMIS Ground Based Observatory (GBO) All Sky Imager (ASI) and magnetormeter (MAG) network. Current (2008) modifications. Future Plans.
Map view with the GBO-s and THEMIS magnetometers superposed as it was in 2007-2008.
PGEO PGEO is being moved to TALO. NARS added Mag left at PGEO. Resolute Bay is shown. Winter 2008-09
PGEO was moved to TALO. Mag left at PGEO. Resolute Bay is shown. Kapu was moved to CMBB. 2009 -
THEMIS GBO winter schedule • 2008-2009. Routine THEMIS operation with low latitude substorm monitoring (Central Canada OK. THB at midnight February 11) • Summer 2009 THB and THC become near lunar monitors • 2009-2010 Routine THEMIS operation with higher latitude phenomena in focus (Eastern Canada and Greenland (THD at midnight on April 12 at 04:00UT) • 2010-2011 (THD at midnight on May 10 at 20:00UT) • 2011-2012 THEMIS related work is completed.