An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. www.niauk.org Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10th July 2012

  2. www.niauk.org UK Nuclear Industry • Pioneer in nuclear generation • Full fuel cycle capability • Highly skilled workforce • Mature and flexible supply chain

  3. www.niauk.org Closure dates for AGR and PWR fleet Torness 2023 Hunterston B 2016 Hartlepool 2019 Heysham 2 2023 Sizewell B 2035 Heysham 1 2019 Dungeness B 2018 Hinkley Point B 2016

  4. www.niauk.org Nuclear Generation Capacity Profile

  5. www.niauk.org New Build Locations

  6. www.niauk.org New Build Plans for UK EDF Energy UK (EDF Energy/Centrica Joint Venture) 2 x 1600 MW EPRs for Hinkley 2 x 1600 MW EPRs for Sizewell 4 operating by 2025 Horizon Nuclear Power Ltd (RWE/Eon Joint Venture) 6000 MW operating by 2025 at Wylfa and Oldbury Technology to be decided NuGeneration Ltd (Iberdrola/GDF Suez Joint Venture) Up to 3600MW operating by 2023 at Moorside Technology to be decided

  7. www.niauk.org Fukushima and reactions “Neither the reviews undertaken by the Licensees for the stress tests, nor the earlier national reviews has indicated any fundamental weaknesses in the definition of design basis events or the safety systems related to the stress tests to withstand them for UK NPPs.” - ONR, January 2012

  8. www.niauk.org Trend shows favourable opinion back to highest ever – though unfavourable opinion still above the baseline Ipsos MORI poll. Base: All adults aged 16+ (1,000 – 2,000). Fieldwork December 2011

  9. www.niauk.org Where are we now…? • Justification: Completed October 2010 • GDA: Conclusions, end 2011 • National Policy Statements: Approved July 2011 • Electricity Market Reform: Energy Bill, 22 May 2012 • Investment approval for first plant: end 2012 Source: Office for Nuclear Development

  10. www.niauk.org NIA UK Capability Report • The UK capability to deliver a new nuclear build programme (NIA 2006) • Report updated in 2008 • New report in Autumn 2012

  11. www.niauk.org New Nuclear Plant Employment

  12. Next GenerationWorkforce for 16GWe New Build

  13. www.niauk.org w w w . n u c l e a r s u p p l y c h a i n . c o m