First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003. TTF2 INJECTOR SCHEMATIC. RF GUN + SOLENOIDES. DOUBLET. S. H. TRIPLET. BC 2. ACC 1. dump. STOP SIMULATIONS AT Z =19 M.
E N D
First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003
TTF2 INJECTOR SCHEMATIC RF GUN + SOLENOIDES DOUBLET S. H. TRIPLET BC 2 ACC 1 dump STOP SIMULATIONS AT Z =19 M Nominal Operation (1) First Operation (2) Bunch Charge 1 nC OK Laser Diameter 3 mm (uniform) OK Laser pulse length 20 ps flat top + 3 ps rise time 20 ps flat top + 6 ps rise time Solenoid Bmax 163 mT OK Phase Gun 34 Deg OK Field Cathode 40 MV/m OK ACC1 (cav 1 to 4) 12.5 MV/m 15 MV/m ACC1 (cav 5 to 8) 20 MV/m 15 MV/m Phase ACC1 -10.8 Deg (w.r.t max energy) on crest ACC39 14 MV/m not present Phase ACC39 183.0 Deg (w.r.t max energy) not present (1) From P.Piot, EPAC 2002, p. 1798 (2) From S. Schreiber, private communication Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
TTF2 LASER (ASTRA GENERATOR OUTPUTS, 2E5 p.) • Transverse distribution : uniform, r = 1.5 mm • Longitudinal distribution : uniform, L=20 ps with ~5 ps rise times • Thermal emittance : 55 keV From TELSA-FEL 97-01 (K. Floettmann) : Longitudinal distribution Transverse distribution Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
PHASE SCAN OF TESLA XFEL WITH ASTRA • TTF2 NOMINAL : 40 MV/m, 0.163 T, L = 20 ps + 3 ps rise time, r =1.5 mm (plot presented at the S2E Workshop, DESY ZEUTHEN, AUG-2002, http://www.desy.de/s2e) Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
ENERGY AND ENERGY SPREAD Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
LONG. PHASE SPACE AT Z=19 M (END INJECTOR) NOMINAL FIRST OPERATION HEAD TAIL TAIL TAIL HEAD Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
EMITTANCE AND ENVELOPE Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
BUNCH LENGTH Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
SPOT AND TRANSVERSE PHASE SPACE (AT Z =19 M) Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
SLICE EMITTANCE AND RMS SIZE (19 M) Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
CURRENT DISTRIBUTION (AT Z =19 M) Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
CONCLUSION NOMINAL FIRST OPERATION • CHARGE 1 nC 1 nC • MOMEMTUN 121.7 MeV/c 134.05 MeV/c • ENERGY SPREAD 0.9 [%] 0.2 [%] • RMS EMITTANCE 1.28 [mm-mrad] 1.75 [mm-mrad] • RMS SIZE 0.41 [mm] 0.41 [mm] • BUNCH LENGTH 1.88 [mm] 2.1 [mm] • PEAK CURRENT ~ 60 [A] ~ 40 [A] • SLICE EMITTANCE ~ 1 [mm-mrad] ~ 1 [mm-mrad] Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM