Objective

Objective Provide enough wind generation to supply 15% of Rhode Island’s native demand from wind powered generation in Rhode Island, for Rhode Island consumers. What does that mean? Native demand = approx. 1,000 MW 1,000 MW X 15% = 150 MW Assume 50% efficiency

arden
Download Presentation

Objective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective Provide enough wind generation to supply 15% of Rhode Island’s native demand from wind powered generation in Rhode Island, for Rhode Island consumers

  2. What does that mean? Native demand = approx. 1,000 MW 1,000 MW X 15% = 150 MW Assume 50% efficiency 150 MW / 50% = 300 MW installed capacity

  3. Where? Blank slate Anywhere in Rhode Island Onshore Near Shore Offshore Single generators Groups of generators One or more wind farms

  4. Site selection criteria Technically feasible Financially feasible Permittable Sites force-ranked based on cost

  5. Business Model To be determined Under consideration: Developer Rhode Island Power Authority Buyers’ Cooperative

  6. Process Solicitation for Site Selection Study Decide on business model RFP for construction