Smart ENergy Delivery ( SEND)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Critical Design Review December 11, 2012 Smart ENergy Delivery (SEND) Christopher Corey, Josh Crowley, John Fischer, Tim Myers, Neil Severson, Kristine Thompson

  2. SEND Mission • Design and implement smart microgrid energy delivery system • Combine multiple/varied energy sources in most efficient use of resources possible • Design system to be as grid-independent as possible

  3. SEND System

  4. Basic System Goals • Detect real time power availability and load demand • Convert sources to single DC bus and deliver required energy to loads • Store energy in battery system for use when resources are unavailable • Monitor load usage and display to user through web interface

  5. Reach Goals • Predictive load profiling • Weather solar resource prediction • System mode control by the user • Load prioritization and control • Add scalability • Allow for multiple source possibilities • System architecture may be followed for higher power applications

  6. Functional Decomposition

  7. Subsystems Design

  8. Hardware Subsystems • Power electronics • Buck DC-DC converter • Gate Driver • Current Control • Full-wave rectifier • Current and voltage sensing • AC • DC • Battery Charging/Monitoring • Interface with control architecture

  9. PV Power Stage Schematic

  10. DC-DC Switching Converter • Step down PV/rectified grid voltage to DC bus efficiently • Design elements to minimize losses • Conduction • Switching • Size for power level used • Control current draw and power point on PV panel using feedback loop • References provided by central controller

  11. Buck Converter

  12. Buck Converter Design • L = = 180μF • C = 3.3 mF • Cutoff above switching frequency • fs = 100kHz • ∆iL = 0.3*IL • Keep out of DCM

  13. Current Programmed Controller

  14. Current Programmed Controller

  15. Current Programmed Controller • In contrast with a voltage comparator • To set duty cycle • Ideal for implementing a charge controller • Necessary for OPPT • Since current is being measured and compared, most accurate • Not ordinarily stable at duty cycles > 50% • Therefore add a slope compensator

  16. Current Programmed Controller Buffer creates a signal appropriate for the MOSFET Clock sets the output high at the beginning of the period Artificial ramp stabilizes circuit When comparator is triggered output drops low, setting the duty cycle

  17. Current Programmed Controller Clock sets the output high Comparator condition met, output set low Slope compensation and reference current Inductor current

  18. Current Programmed Controller • Choosing a chip to match our requirements: • Large duty cycles • 100kHz frequency • 12V operation • Current sense/ mode control • Good documentation

  19. UC3843 Slope compensator for stability Current Transformer for isolation and efficiency Oscillator Input filter

  20. Gate Driver

  21. Gate Driver • However the duty cycle output is 5V • Not sufficient to drive the MOSFET • Vgs = Gate, Source Voltage Minimum 12V

  22. Gate Driver • The gate driver takes the 5V duty cycle and converts it to a signal for the MOSFET • Represented by the buffer on the output

  23. Gate Driver 12V 0V Voltage Limit Dampening Resistor Step down transformer From CPC MOSFET Driver Charge Capacitor Bleed Resistor 12V -12V

  24. Rectifier

  25. Rectifier

  26. Rectifier Full bridge rectifier Smoothing capacitor for DC voltage

  27. Rectifier Converter • Necessary to match the changing battery voltage • Steps down input voltage • Requires current programmed controller and gate driver • Signal from main controller

  28. Microcontroller Hardware

  29. MSP430 Connections • 3.3V UART • Beaglebone • SPI • AC Current/Voltage Sensing • ADC • DC Current/Voltage Sensing • PWM • Current Reference

  30. MSP430

  31. ADE7753 Power Meter IC

  32. ADE7753 Optoisolation • ADE7753 5V TTL Logic • MSP430 3.3v • ADE7753 connected to high voltages, such as 120V RMS on the grid connection.

  33. Software Subsystems

  34. MSP430 Drivers • To minimize code refactoring, we isolated hardware dependent code in driver software modules. • Minimized changes when transitioning from MSP430f636 to MSP430f6333

  35. Software Overview

  36. Software State • Software state determined by battery state of charge. • State 0 – Initialization • State 1 – Low Battery • State 2 – Sufficient Battery • State 3 – Maximum Battery

  37. State 0 – Initialization

  38. State 1 – Low Battery

  39. State 2 – Sufficient Battery

  40. State 3 – Maximum Battery

  41. Beaglebone Software

  42. Web Interface

  43. BeagleBone Data Flow Diagram

  44. BeagleBone • Python • Serial Interface • Weather Forecasting • Database Connection (Write) • Mysql • Single Database Multiple Tables • Lighttpd • Single site send.int.colorado.edu • PHP • Database Connection (Read)

  45. Prototyping & Results in Software

  46. Load Monitoring Prototype

  47. Progress in Software Development • Software Drivers developed and tested on the MSP430 F6736 series • Serial • Analog to Digital Conversion • Load Monitoring Prototype • Open-Loop Toroid • User Interface • Minimizing use of the BeagleBone

  48. MSP430 Status • Testing and Prototyping done on F6736 series • Sampling Times • ¼ second per 1000 samples • Considering a move to F433x series given an increase in hardware ADCs • F433x series provides 12 ADCs at up to 12bit precision • Drivers would need to be ported

  49. Load Monitoring Prototype • Resistive loads should be more accurate indicating incorrect calibration constant • Non-Linear Differences when adding/removing loads • Mitigate using Energy Sense IC with <0.1% error

  50. User Interface • Energy Data • Real-time updating graphs of load usage • Weather Prediction • Solar radiance prediction using cloud cover data from weatherunderground.com • Javascript + Highcharts • Fast rendering • PHP Development • Future of the User Interface