320 likes | 473 Views
West Central FL Safety Alliance By Dr. Isabel Perry “The Safety Doctor”. Safety NOW : using 21 st century Technology. Our Audience. Industry: Construction? Hospitality? Insurance? Manufacturing? Health Care? Other?. OSHA Heat Safety Tool (I and A---free). SPLnFFT Noise Meter.
E N D
West Central FL Safety Alliance By Dr. Isabel Perry “The Safety Doctor” Safety NOW:using 21st century Technology
Our Audience • Industry: • Construction? • Hospitality? • Insurance? • Manufacturing? • Health Care? • Other?
Pocket First Aid & CPR from the American Heart Association $1.99
“WISER (Wireless Information System for Emergency Responders) (I and A---free)
iTriage – Health, Doctor, Symptoms and Healthcare search (I and A----free)
FallClear LITE – Fall Arrest Clearance Calculators (I-phone---free)
I Auditor ($5/month/person) http://www.safetyculture.com.au/safetycloud/tour/
EHS Training • Online • Blended • LMS---CD ROM • SKYPE • Webinar • Podcast • Games???????????
Mobile Friendly Safety Games • http://thesafetydoctor.com/nl/games/marathon/game.html# • http://thesafetydoctor.com/nl/games/wordguess/game.html# • http://thesafetydoctor.com/nl/games/boardgame/game.html# • http://thesafetydoctor.com/nl/games/wordguess/game.html#
How can I put safety on the top of the mind EVERY morning?
From Safety APPs and Programs to SHMS (Safety & Health Management Systems)
6 Elements of PEP SMS(Program Evaluation Profile) • Management Leadership and Employee Participation • Workplace Analysis • Accident and Record Analysis • Hazard Prevention and Control • Emergency Response • Safety and Health Training
Injury and Illness Prevention Program(I2P2)—proposed & postponed by OSHA • Management Leadership • Establish clear safety and health goals for the program and define the actions needed to achieve those goals. • Designate one or more individuals with overall responsibility for implementing and maintaining the program. • Provide sufficient resources to ensure effective program implementation. • Worker Participation • Hazard Identification and Assessment • Hazard Prevention and Control • Education and Training • Program Evaluation and Improvement
5 VPP SHMS Elements Management Leadership Employee Involvement Worksite Analysis Hazard Prevention Safety & Health Training
8 Elements of OHSAS 18001 • Planning for hazard identification, risk assessment & risk control • OHSAS management program • Structure & responsibility • Training, awareness & competence • Consultation & communication • Operational control • Emergency preparedness & response • Performance measuring, monitoring & improvement
OHSAS 18001 to ISO 45001October 2013 --- 3 yearsUS Technical Advisory Group (U.S. TAG)--ANZI Z 10Similar to GHS adoption
Time Frame for ISO 45001 Development • Dec 2013 –Working Draft 1 (WD1) circulated Working Group 1 • Jan 2014 – Submit Comments on WD1 • Jan 2014 – US TAG Face to Face Meeting (to develop US positions/concerns on WD1) • March 2014 – PC Meeting – Development of Committee Draft 1 • November 2014 – PC Meeting – Development of Draft International Standard • November 2015 –PC Meeting – Development of Final Draft International Standard • October 2016 – Publish ISO 45001
Discussion & Questions Dr. (Isabel) Perry isabel@TheSafetyDoctor.com Coming soon: www.21stCenturySafety.com Please complete the green sheet and return to me. Thank you!!