Results from the HiRadMat Dry Run on 07.04.2011

Results from the HiRadMat Dry Run on 07.04.2011. C. Hessler, B. Goddard, V. Kain, M. Meddahi Thanks to all WG1 members! HiRadMat Project Team Meeting 14.04.2011. BTV Test. All BTVs (BTV.660105, BTV.660221 and BTV.660518) are working. BTVs have been calibrated by Stephane Burger. BTV Test.

arissa
Download Presentation

Results from the HiRadMat Dry Run on 07.04.2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results from the HiRadMat Dry Run on 07.04.2011 C. Hessler, B. Goddard, V. Kain, M. Meddahi Thanks to all WG1 members! HiRadMat Project Team Meeting 14.04.2011

  2. BTV Test • All BTVs (BTV.660105, BTV.660221 and BTV.660518) are working. • BTVs have been calibrated by Stephane Burger. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  3. BTV Test • Screen matching application is working. • Logging is working (also with SDDS). C. Hessler, B. Goddard, V. Kain, M. Meddahi

  4. BLM Test • The triggering on HiRadMat in the BLM application is working. • The logging is working. • Critical settings can be set. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  5. BPM Test • All BPMs including the BPKG are appearing in YASP and TIMBER. • YASP is acquiring data. • Logging is working . C. Hessler, B. Goddard, V. Kain, M. Meddahi

  6. BCTFI Test • Fast BCT application is acquiring data. • Logging is working. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  7. Test of power converter logging • All power converters appear in TIMBER. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  8. Interlock test • FMCMs successfully tested by Markus Zerlauth. • FEI not connected to BIS. Need to be checked. • BETS is not yet working. Need to be checked. • BTV interlock needs to be checked. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  9. Optics test • HiRadMat optics selection application is working. • After selecting new optics with this application and some manual intervention, the optics are visible in YASP and the screen matching application. C. Hessler, B. Goddard, V. Kain, M. Meddahi

  10. Tests still to do • Pulsing of the magnet of the entire line with real values. • Check if all interlocks are ok. • Timing request, dynamic destinations. • Kicker pulsing. • BETS. C. Hessler, B. Goddard, V. Kain, M. Meddahi