Checklist Procedures for Designers and Reviewers

Checklist Procedures for Designers and Reviewers. Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing Activities. Issued May 2009. Three Checklists. Stand Alone Projects Infrastructure Projects Common Developments Appendix 1

arleen
Download Presentation

Checklist Procedures for Designers and Reviewers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Checklist Procedures for Designers and Reviewers Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing Activities Issued May 2009

  2. Three Checklists • Stand Alone Projects • Infrastructure Projects • Common Developments • Appendix 1 • Guidance Document • Available at www.gaswcc.georgia.gov

  3. Updates • The new revised checklists include all of the previous requirements of the July, 2007 version • Updated to include revisions to the NPDES General Permits

  4. Effective January 1, 2009 • All ES&PC plans submitted for review starting January 1, 2009 are required to include a copy of the appropriate completed checklist.

  5. 1. • The applicable Erosion, Sedimentation and Pollution Control Plan Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted. • The completed Checklist must be submitted with the ES&PC Plan or the Plan will not be reviewed.

  6. 2. • Level II certification number issued by the Commission, signature and seal of certified Design Professional. • Signature, seal, and GSWCC issued Level II certification number must be on each sheet pertaining to ES&PC or the Plan will not be reviewed.

  7. 3.

  8. 4.

  9. 5.

  10. 6.

  11. 7. • Provide vicinity maps showing site’s relation to other areas. Include designation of specific phase, if necessary. • Site location must be delineated showing surrounding area roads and highways. If the project is being done in phases, each individual phase must be delineated and labeled. This information is important for Plan reviewers if a site visit is needed, or if the site needs to be located on another map.

  12. 8. • Graphic scale and North arrow. • The graphic scale and North arrow must be clearly shown on all phases of the ES&PC Plan sheets.

  13. 9. • Existing and proposed contour lines with contour lines drawn at an interval in accordance with the following: • The initial, intermediate, and final phase sheets of the Plan must show the proposed grade in bold contour lines with the below intervals overlaying the original contour lines. Elevations of both the existing and proposed contour lines must be shown.

  14. 10. • Boundary line survey. • The ES&PC Plan shall include existing conditions and topography sheet with the boundary lines of the project or phase shown on the sheet.

  15. 11. • Delineation and acreage of contributing drainage basins on the project site. • The existing site Plan or the initial phase Plan must show delineation of each drainage basin on the project site with the acreage of each basin noted. As the basins are altered during grading for the intermediate phase of the Plan, the new basins and acreage must be delineated. If the basins are changed on the final phase of the Plan, delineate new basins with acreage noted.

  16. 12. • Delineation of on-site wetlands and all state waters located on and within 200 feet of the project site. • ALL STATE WATERS LOCATED ON AND WITHIN 200 FEET OF THE PROJECT SITE MUST BE DELINEATED ON ALL PHASES OF THE PLAN. When a project is located in a jurisdiction with a certified Local Issuing Authority and the LIA must make a determination of State Waters that are not delineated on the plan, the Plan review could be delayed for beyond the full forty-five day review time allowed to the LIA, or the full thirty-five day review time allowed to the District if the District is reviewing the plan. For all projects in a jurisdiction where there is no certified Local Issuing Authority regulating that project, EPD is responsible for State waters determinations and there is no time limits for reviewing the Plan. ALL WETLANDS LOCATED WITHIN THE PROJECT SITE ONLY MUST BE DELINEATED. If the Local Issuing Authority requires an undisturbed buffer of wetlands, delineate required buffer.

  17. 13 • Delineation of the applicable 25-foot or 50-foot undisturbed buffers adjacent to state waters and any additional buffers required by the Local Issuing Authority. Clearly note and delineate all areas of impact. • The State Law of Georgia mandates these minimum undisturbed buffers, but the Local Issuing Authorities are allowed to require more stringent buffers of state waters. The minimum undisturbed buffers required by the state and all other buffers of state waters required by the issuing authority must be delineated. Any undisturbed buffer area that is impacted by the project site must be noted on the Plan.

  18. 14 • Delineate all sampling locations, perennial and intermittent streams and other water bodies into which storm water is discharged. • The Plan shall include a USGS topographic map, a topographic map or a drawing (referred to as a topographic map) that is a scale equal to or more detailed than a 1:24000 map showing the locations of the site or the common development. The map must include (a) the location of all perennial and intermittent streams and other water bodies as shown on a USGS topographic map, and all other perennial and intermittent streams and other water bodies located during the mandatory field verification, into which the storm water is discharged and (b) the receiving water and/or outfall sampling locations. When the permittee has chosen to use a USGS topographic map and the receiving water(s) is not shown on the USGS topographic map, the location of the receiving water(s) must be hand-drawn on the USGS topographic map from where the storm water(s) enters the receiving water(s) to the point where the receiving water(s) combines with the first blue line stream shown on the USGS topographic map.

  19. 15 • Storm-drain pipe and weir velocities with appropriate outlet protection to accommodate discharges without erosion. Identify/Delineate all storm water discharge points. • The storm-drain pipe and weir velocities must show the flow characteristics of the pipe at full flow including pipe diameter, flow rate (cfs), velocity (fps), and tail water conditions. This information should be in a chart shown on storm-drain profile sheet, ES&PC intermediate phase sheet or on the ES&PC detail sheet that shows outlet protection. The dimensions of the apron must include length (La), width at the headwall (W1), down-stream width (W2), average stone diameter (d50), and stone depth(D) designed in accordance with Figures 6-24.1 and 6-24.2 in the Manual. These should be shown in a chart on ES&PC intermediate and/or final phase sheet or ES&PC detail sheet with outlet protection. Velocity dissipation devices shall be placed at all discharge locations and along the length of any outfall channel for the purpose of providing a non-erosive velocity flow from the structure to a water course so that the natural physical and biological functions and characteristics are maintained and protected.

  20. 16 • Soil series for the project site and their delineation. • Soil series delineations are required for the Plan review and can be found on the NRCS web site. The highest level of soil survey required for the project site, such as a level three or level four survey for projects that will be using septic systems, must be delineated on the Plan. The soil series delineation should be shown on the existing site Plan or the initial phase Plan. A chart listing the soils located on the project should be shown on the sheet with their delineation.

  21. 17 • Identify the project receiving waters and describe all adjacent areas including streams, lakes, residential areas, wetlands, etc. which may be affected. • The name of the initial receiving water(s) or if unnamed the first named blue line stream indicated on the appropriate USGS Topographic map, and when the discharge is through a municipal separate storm sewer system (MS4), the name of the local government operating the municipal separate storm sewer system and the name of the receiving water(s) which receives the discharge from the MS4, and the permittee's determination of whether the receiving water(s) supports warm water fisheries or is a trout stream. Describe any neighboring area which could be affected by the post-developed runoff from the site.

  22. 18 • Any construction activity which discharges storm water into an Impaired Stream Segment, or within 1 linear mile upstream of and within the same watershed as, any portion of an Biota Impaired Stream Segment must comply with Part III. C. of the Permit. Include the completed Appendix 1 listing all the BMPs that will be used for those areas of the site which discharge to the Impaired Stream Segment. • If any storm water associated with construction activities discharges into an Impaired Stream Segment that has been listed for the criteria violated, "Bio F"(Impaired Fish Community) and/or "Bio M" (Impaired Macro invertebrate Community), within Category 4a, 4b or 5, and the potential cause is either "NP"(nonpoint source) or "UR" (urban runoff), the ES&PC Plan must include at least four (4) of the BMPs listed in Part III.C.2. (a) - (t) of the Permit. The Impaired Stream Segment(s) should be delineated on the ES&PC Plan. Georgia's 2008 and subsequent "305(b)/303(d) List Documents (Final)” can be viewed on the GA EPD website at www.gaepd.org.

  23. 19 • If a TMDL Implementation Plan for sediment has been finalized for the Impaired Stream Segment (identified in item 18 above) at least six months prior to submittal of NOI, the ES&PC Plan must address any site-specific conditions or requirements included in the TMDL Implementation Plan. • List of TMDL Implementation Plans can be viewed on the GA EPD website, www.gaepd.org.

  24. 20 • Provide hydrology study and maps of drainage basins for both the pre- and post-developed conditions. • Hydrology study and drainage maps should be separate from the Plan. Maps should include each individual basin draining to, through and from the project site, with each one delineated, labeled and showing its total acreage.

  25. 21 • Initial date of the Plan and the dates of any revisions made to the Plan including the entity who requested the revisions. • The initial Plan date should be shown on all pages. With each re-submittal the revision date and entity requesting revisions should be shown on cover sheet and each sheet that has been revised.

  26. 22 • The limits of disturbance for each phase of construction. • The limits of disturbance for the initial phase should delineate only the area required to be disturbed for the installation of perimeter control and initial sediment storage. The intermediate phase should delineate the entire area to be disturbed for that phase, such as grading, drainage, utilities installed, etc. The final phase should delineate any additional areas to be disturbed such as individual lots, etc.

  27. 23 • Limit of disturbance shall be no greater than 50 acres for each individual permittee (i.e. Primary, Secondary or Tertiary) at any one time and no more than 50 contiguous acres at one time without prior written authorization from the EPD District Office. If EPD approves the request to disturb 50 acres or more at anyone time, the Plan must include at least 4 of the BMPs listed in Appendix 1 of this checklist. • A copy of the written approval by EPD must be attached to the Plan for the Plan to be reviewed.

  28. 24

  29. 25 • Use of alternative BMPs whose performance has been documented to be equivalent to or superior to conventional BMPs as certified by a Design Professional (unless disapproved by GA EPD or the Georgia Soil and Water Conservation Commission). • Please refer to the Alternative BMP Guidance Document found at www.gaswcc.georgia.gov.

  30. 26 • Best Management Practices to minimize off-site vehicle tracking of sediments and the generation of dust. • The Plan must establish BMPs designed to minimize or eliminate the off-site vehicle tracking of dust, dirt, sand, soils and sediment and the generation of dust to the maximum extent practicable. The plan should indicate structural BMPs such as construction exits as well as a narrative description of the actions to be taken and/or equipment to be available and used as necessary to control dust and off-site vehicle tracking. Some requirements of the Plan may need a more detailed description of BMPs than a typical drawing can provide. These items should be clarified with a narrative description shown on the Plan or in the ES&PC notes.

  31. 27 • BMPs for concrete wash down of tools, concrete mixer chutes, hoppers and the rear of the vehicles. Washout of the drum at the construction site is prohibited. • When the project allows the concrete wash down of tools, concrete mixer chutes, hoppers and rear of the vehicles on the project site, delineate the location of the area provided for washing and provide detail(s) of BMPs that will be used. If the project does not allow the concrete washdown on the project site state so on the plan.

  32. 28 • Provide BMPs for the remediation of all petroleum spills and leaks. • The Plan must provide BMPs and guidance for the prevention of spills and leaks of petroleum products from any areas where such products are stored or used as well as guidance for the proper remediation of any spills and leaks that do occur. This information can be in the form of a separate Spill Prevention/Spill Response document so long as that information accompanies the Plan.

  33. 29 • Plan addresses BMPs for all phases of common development including individual building lots and out-parcels, etc. regardless of who owns or operates the individual sites. Include a typical and any situational lots applicable. • The Erosion, Sedimentation & Pollution Control plans for a common development is designed for the life of the project and must include practices to be implemented by all secondary permittees involved, whether the primary permittee relinquishes ownership of the land rights or not. This includes providing an ES&PC Plan for typical and situational lots for each secondary permittee (builder) who purchases a lot from the primary permittee (developer). Situational lots may include, but are not limited to, lots adjacent to state waters buffers (in which a double row of Type C silt fence must be shown adjacent to buffer), lots adjacent to wetlands, lots with an extreme grade, etc.

  34. 30 • Location of Best Management Practices that are consistent with and no less stringent than the Manual for Erosion and Sediment Control in Georgia. Use uniform coding symbols from the Manual, Chapter 6, with legend. • BMPs for all phases of the Plan must be consistent with and no less stringent than the Manual and shown using uniform coding symbols from the Manual. The uniform coding symbols legend from the Manual must be included and may be shown on detail sheet or any of the ES&PC Plan sheets.

  35. 31 • Description of the nature of construction activity. • Provide a description of the existing site and a description of the proposed project. These must be shown on ES&PC Plan or under ES&PC notes. Existing land is currently undeveloped and forested with primarily pines and hardwoods. Proposed project is a 25 lot single-family residential development that will disturb 15.5 acres. Project does not propose any encroachments into the State Waters buffer area.

  36. 32 • A description of appropriate controls and measures that will be implemented at the construction site including: (1) initial sediment storage requirements and perimeter control BMPs, (2) intermediate grading and drainage BMPs, and (3) final BMPs. • The Plan must be shown in a minimum of three phases with each phase shown on a separate sheet. Initial phase of the Plan must include the required 67 cy per acre sediment storage, construction exit, tree-save fence if applicable and any other BMPs necessary to prevent sediment from leaving the site such as silt fence, inlet protection on existing storm drain structures, diversions, check dams, temporary ground cover, etc. Limits of disturbance for the initial phase are to be only the areas needed to install initial BMPs. The intermediate phase should show rough grading and utility construction. BMPs should include initial inlet protection, additional silt fence as needed, any revised sediment storage needed as drainage basins are altered, outlet protection, retrofit if applicable, matting with temporary or permanent vegetation as needed, temporary down drains, filter rings, etc. Final phase of Plan should show finished grade, curbing and paving if applicable, building construction if applicable, etc. BMPs should include permanent vegetation, appropriate inlet protection, etc. For construction sites where there will be no mass grading and the initial perimeter control BMPs, intermediate grading and drainage BMPs, and the final BMPs are the same, the Plan may combine all of the BMPs into a single phase Plan. The Plan will include appropriate staging and access requirements for construction equipment.

  37. 33 • Description and chart or timeline of the intended sequence of major activities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMPs, clearing and grubbing activities, excavation activities, utility activities, temporary and final stabilization). • Activity schedule must be site specific. The narrative description and timeline for each phase of construction may be shown on ES&PC Plan sheet or under ES&PC notes.

  38. 34 • Description of the practices that will be used to reduce the pollutants in storm water discharges. • The Plan must identify all potential sources of storm water pollution expected to be present on the site and provide a narrative explaining how the pollutants will be minimized in the storm water discharges.

  39. 35 • Description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed. • The Plan must contain a description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed. These may include storm water detention and retention structures, use of vegetated swales and natural depressions for flow attenuation or a combination of these practices (sequential systems). The Plan must also include a technical explanation of the basis used to select these practices where flows will exceed pre-development levels. The Plan must indicate that velocity dissipation devices will be placed at discharge locations and along the length of any outflow channel in order to provide a non-erosive flow so that the natural physical and biological characteristics and functions of the water course are maintained and protected. The installation of these devices may be subject to Section 404 of the Federal Clean Water Act. Note: The permittee is only responsible for the installation and maintenance of storm water management devices prior to final stabilization of the site and not the operation and maintenance of such structures after construction activities have been completed.

  40. 36 • Design professional's certification statement and signature that the site was visited prior to development of the ES&PC Plan as stated on page 17 of the permit. • The following statement and the signature of the design professional must be shown on the ES&PC Plan or under ES&PC notes. "I certify under penalty of law that this Plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my supervision."

  41. 37 • Design professional's certification statement and signature that the permittee’s ES&PC Plan provides for an appropriate and comprehensive system of BMPs and sampling to meet permit requirements as stated on page 17 of the permit. • The following statement and the signature of the design professional must be shown on the ES&PC Plan or under ES&PC notes. " I certify that the permittee's Erosion, Sedimentation and Pollution Control Plan provides for an appropriate and comprehensive system of best management practices required by the Georgia Water Quality Control Act and the document "Manual for Erosion and Sediment Control in Georgia" (Manual) published by the State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, provides for the sampling of the receiving water(s) or the sampling of the storm water outfalls and that the designed system of best management practices and sampling methods is expected to meet the requirements contained in the General NPDES Permit No. GAR 10000_."

  42. 38 • Certification statement and signature of the permittee or the duly authorized representative as stated in section V.G.2.d. of the state general permit. • The following statement and the signature of the permittee or the duly authorized representative must be shown on the ES&PC Plan or under ES&PC notes. " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that certified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

  43. 39 • An estimate of the runoff coefficient or peak discharge flow of the site prior to and after construction activities are completed. • The Plan must provide both pre- and post-construction estimates of the runoff coefficient or peak discharge flow for the site. This can be in the form of a hydrologic study so long as that study is made a part of the Plan and accompanies the Plan. A complete hydrologic study is not a required element of the Plan, only the pre and post-construction estimates of the run-off coefficient or peak discharge flow for the site.

  44. 40 • Indication that non-exempt activities shall not be conducted within the 25 or 50-foot undisturbed stream buffers as measured from the point of wrested vegetation without first acquiring the necessary variances and permits. • See Part IV. EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN (I) and (II) on pages 17 & 18 of the permit and show under ES&PCnotes. 1. NO ACTIVITIES SHALL BE CONDUCTED WITHIN THE 25 OR 50-FOOT STREAM BUFFER ALONG THE BANKS OF ALL STATE WATERS, UNLESSA VARIANCE HAS BEEN OBTAINED FROM THE GA EPD DIRECTOR.

  45. 41 • Indication that the design professional who prepared the ES&PC Plan is to inspect the installation of the initial sediment storage requirements and perimeter control BMPs within 7 days after installation. • The Plan must include a statement indicating that the primary permittee and tertiary permittee(s) must retain the design professional who prepared the Plan, except when the permittee has requested in writing and EPD has agreed to an alternate design professional, to inspect the installation of the initial sediment storage requirements and perimeter control BMPs which the design professional designed within seven (7) days after installation. The design professional shall determine if these BMPs have been installed and are being maintained as designed. The design professional shall report the results of the inspection to the permittee within seven (7) days and the permittee must correct all deficiencies within two (2) business days of receipt of the inspection report from the design professional unless weather related site conditions are such that additional time is required.

  46. 42 • Indication that amendments/revisions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional. • See part IV. C. on page 20 of the permit. This can be clarified in a narrative and shown under ES&PC notes. Revisions or amendments should be submitted to the Local Issuing Authority for review.

  47. 43 • Indication that waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit. • The Plan must include a description of how waste materials, including waste building materials, construction and demolition debris, concrete washout, excavated sediment, etc., will be properly disposed of. Any disposal of solid waste to waters of the State is prohibited unless authorized by a Section 404 permit. Indication that waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit.

  48. 44 • Indication that the applicable portion of ES&PC Plan is to be provided to each secondary permittee prior to the secondary conducting any construction activity and that each secondary shall sign the Plan or portion of the Plan applicable to their site. List the names and addresses of all secondary permittees. • The Plan must contain a list of and contact information for all secondary permittees and a statement that the primary permittee shall provide a copy of the Plan (and any subsequent revisions to the Plan) to each secondary permittee. The Plan must include a section for each secondary to sign indicating that they have made a written acknowledgement of receipt of the Plan and a copy of the acknowledgement must be kept in the primary’s records.

  49. 45 • Documentation that the ES&PC Plan is in compliance with waste disposal, sanitary sewer, or septic tank regulations during and after construction activities have been completed. • The Plan must provide for the proper disposal of sewage and other wastes generated during construction operations. The plan must ensure that the site complies with any applicable State or local regulations regarding waste disposal, sanitary sewer, or septic tanks.

  50. 46 • Provide complete requirements of inspections and record keeping by the primary permittee, secondary permittees and tertiary permittees. • The Plan must include all of the inspections and record keeping requirements of the primary, secondary and tertiary permittees as stated in Part IV.D.4.on pages 24 - 28 of the Permit. The complete inspection and record keeping requirements shall be shown on the Plan under ES&PS notes.