320 likes | 509 Views
. A note of caution
E N D
1. Ocean Park Boulevard Streetscape Improvement Project
4/23/08 Alternatives Presentation
City of Santa Monica
URBAN STUDIO
3. 3/3/08 Workshop 1 - What We Heard Emphasize walkability & pedestrian safety
Emphasize bikeability
Address general traffic issues.
Slow down vehicular traffic
Improve pedestrian safety around the school
Address traffic issues at OPB & Highland intersection
Address traffic issues at OPB & Lincoln intersection
Redesign 4th St. overpass Emphasize view from 4th St. overpass
Provide gateways, landmarks and public art
Emphasize environmental sustainability
Provide more and better greenery
Beautify
Enhance bus stops
Maintain & protect mural at Main St. and OPB
Address flooding at 5th St.
5. 20’-0” minimum lane width for emergency vehicle access
Maximum 150’ median length
Minimum 6’-0” Bicycle Lanes
180’-0” of length of transition and stop at each bus stop
Minimize new lighting electrical loads
Maintain parking at SMASH/Muir schools
Maintain security fence at Olympic High School
10’-0” minimum lane width / 12’-0” preferred
Minimum sidewalk width =
6. Approach A - develop OPB Task Force proposal - further existing OPB Task Force consensus - “OPB PLUS”
Approach B - maximize median opportunities - minimize costs - “MEDIAN SUPREME”
Approach C - maximize dedicated and separated bikeway opportunity - “BIKE HAVEN”
7. Alternative A - OPB PLUS Maintains intent of OPB Plan
Typical curb-to-curb width 46’-0” vs.. (e) 64’-0”
Introduces parkways at curb and select medians
Provides Class II 6’-0” In-street bicycle lane
Maximizes parkways and eliminates median at 4th St. bridge to maximize view corridor to ocean
Restricts left-turns at select locations
13. Alternative B - MEDIAN SUPREME Maximizes medians along entire length of OPB
Maintains width of existing curb-to-curb right-of-way
Enhances sidewalks with pavers and trees - no additional sidewalk width
Introduces protected crosswalks at Highland & 7th - increased neighborhood to neighborhood connectivity
Provides Class II 6’-0” in=street bicycle lane
Restricts left turns at select locations
19. Alternative C - BIKE HAVEN Maximizes medians along entire length of OPB
Maintains width of existing curb-to-curb right-of-way
Enhances sidewalks with pavers and trees - no additional sidewalk width
Introduces protected crosswalks at Highland & 7th - increased neighborhood to neighborhood connectivity
Provides Class II 6’-0” in=street bicycle lane
Restricts left turns at select locations
30. Where do we go from here?
31. We Need Your Feedback Now! Table Hop
Ask Questions
Provide Comments
Let us know what you think
Gather as group to summarize
32. Do you want more information? This presentation and workshop materials will soon be available on our website:
www.smgov.net/planning/greenoceanparkblvdwest.html
33. Ocean Park Boulevard Streetscape Improvement Project
4/23/08 Alternatives Presentation
City of Santa Monica
URBAN STUDIO