PIEDMONT MIDDLE SCHOOL (E) TRAILER (E) STORAGE (E) TRAILER (E) TRANSFORMER (E) WORKSHOP SITE PLAN
STRUCTURAL • STRUCTURES DO NOT MEET ASCE 31 • WOOD BUILDING AND TRAILERS WILL LIKELY FALL OFF SUPPORTS • PREFAB UNLIKELY TO COLLAPSE, BUT MAY BE DAMAGED • MEZZANINES DO NOT MEET CODE • MANY NONSTRUCTURAL HAZARDS • CONTINUED OPERATIONS SEVERELY IMPAIRED OR PREVENTED AFTER EARTHQUAKE • ESSENTIAL IN PREPAREDNESS AND RECOVERY OPERATION
ADA / ACCESSIBILITY • PATH OF TRAVEL NON COMPLIANT • NO ACCESSIBLE ROUTE • LACK OF CODE COMPLIANT DIRECTIONAL SIGNAGE • STAIRS ARE NON COMPLIANT • NO RAMP FOR WHEELCHAIR ACCESS • NO ACCESSIBLE PARKING
FIRE & LIFE SAFETY • EXTERIOR SIDES OF EXIT DOORS DO NOT HAVE HANDRAILS OR LANDINGS • LACK OF PROPER EXHAUST SYSTEMS • LACK OF OSHA COMPLIANCE • NO FIRE ALARM • UNSAFE STORAGE
VARIOUS OPTIONS: • REPAIR EXISTING BUILDINGS • REMOVE WOOD FRAME BUILDINGS AND TRAILERS, REPLACE WITH NEW BUILDINGS • REPLACE ALL BUILDINGS
1. NEW WORKSHOP/ UPGRADED METAL BUILDING • PROJECT COST: $ 1 – 1.8 Million • OUTCOMES: • More functional • 5 Standard parking spaces • Meets ASCE 41 2,000 sf 2,000 sf EXISTING NEW
2. NEW WORKSHOP/ STORAGE/ OFFICES • PROJECT COST:$ 2.7 Million • OUTCOMES: • 4000 sf new building • Code compliant • 5 truck parking spaces plus 3 standard parking spaces • Efficient layout 4,000 sf EXISTING NEW
R. P. Gallagher Associates Structural Engineers PHS – MAINTENANCE BUILDING PRISCILLA MECKLEY – ARCHULETA MIKE WASSERMANN JOHN NELSON RON GALLAGHER* For more information, visit http://www.pusdbond.org