1 / 13

SCENARIO 2 PRESENTATION

SCENARIO 2 PRESENTATION. 345KV HVDC ALTERNATIVE ROBERT LONA SENIOR CONSULTANT ERCOT SYSTEM PLANNING 3/10//2008. HVDC COST ASSUMPTIONS. $250/KW HVDC RATING(MW) COST $M 1000 $789 1500 $1,039

armani
Download Presentation

SCENARIO 2 PRESENTATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCENARIO 2PRESENTATION 345KV HVDC ALTERNATIVE ROBERT LONA SENIOR CONSULTANT ERCOT SYSTEM PLANNING 3/10//2008

  2. HVDCCOST ASSUMPTIONS • $250/KW HVDC RATING(MW) COST $M 1000 $789 1500 $1,039 2000 $1,289 2500 $1,539 3000 $1,789 4000 $2,289 • $1.05 MILLION/MILE(APPROXIMATELY 70% OF AC LINE COST)

  3. 3000MW HVDC ALTERNATIVES • BLUFF CRK 345KV BUS – EVERMAN 345KV BUS • PANHANDLE – NAVARRO 345KV BUS • ODESSA 345KV BUS – W.A.PARISH 345KV BUS • OTHERS?

  4. BLUFF CRK – EVERMAN 3000MW HVDC • ~ 165 MILES • ESTIMATED TRANSMISSION COST $173 MILLION • HVDC COST $1,500 MILLION • TOTAL HVDC COST $1.673 BILLION

  5. HVDC: BLUFCRK5 – EVERMAN5 SALADO5 KENDALL

  6. CURRENT STATUS OF BLFCRK – EVERMAN HVDC 4 – MONTH WIND CURTAILMENT MCCAMEY CENTRAL PANHANDLE OVERALL 3.21% 5.62% 11.12% 6.93% TRANSMISSION COST COMPARABLE TO FULL 345KV AC CASES WITH 2% CURTAILMENT

  7. PANHANDLE – NAVARRO 3000MW HVDC • ~ 275 MILES • ESTIMATED TRANSMISSION COST $289 MILLION • HVDC COST $1,500 MILLION • TOTAL HVDC COST $1,789

  8. 3000MW HVDC: PANHANDLE – NAVARRO

  9. NAVARRO SALADO KENDALL

  10. CURRENT STATUS OF PANHANDLE - NAVARRO HVDC 4- MONTH WIND CURTAILMENT MCCAMEY CENTRAL PANHANDLE OVERALL 8.61% 20.12% 3.28% 12.45% TRANSMISSION COST COMPARABLE TO FULL 345KV AC CASES WITH 2% CURTAILMENT

  11. NEXT STEPS

  12. QUESTIONS ?

More Related