140 likes | 334 Views
2006 ITRS Spring Meeting. Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics. Monday Plenary Agenda. Monday Morning Welcome Overview of Days Agendas & Special Events 2006 Update Task 2006 Key Dates Instructions for the ITWGs for Monday other items
E N D
2006 ITRS Spring Meeting Sponsored byInfineon Technologies Philips Semiconductors STMicroelectronics
Monday Plenary Agenda • Monday Morning • Welcome • Overview of Days Agendas & Special Events • 2006 Update Task • 2006 Key Dates • Instructions for the ITWGs for Monday • other items • Monday Afternoon • IRC Rollout [Start times may be adjusted] • TWG Q&A
Tuesday Plenary Agenda • Tuesday Morning • Optional Plenary [decided at Monday PM] • Key Challenges for each ITWG for 2006 • Tuesday Afternoon • IRC Rollout • TWG Q&A
Agenda April 6 (Thursday) • 8:30 - 9:15 Registration • 9:15 - 10:00 Plenary General Session with ITWGs/IRC • 10:00 - 12:00 Breakout for ITWGs and IRC • 12:00 - 13:30 Lunch • 13:30 - 16:45 Continued Breakout for ITWGs and IRC • 16:45 - 17:30 Plenary with ITWGs/IRC Rollout • 17:30 - 18:00 Break before dinner • 18:00 Bus leaves for Hap and Stap event • 18:00- 20:00 Dinner Evening Details The special event on Thursday evening is called Hap and Stap. It includes a walking tour of Maastricht and a selection of restaurants for the evening.
Agenda April 7 (Friday) • 8:30 - 10:00 Breakout for ITWGs and IRC [or Optional Plenary with IRC/ITWGs] • 10:00 - 12:00 Continued Breakout for ITWGs and IRC • 12:00 - 13:00 Lunch • 13:00 - 16:45 Continued Breakout for ITWGs and IRC • 16:45 - 17:30 Plenary • 17:30- 18:00 Break before dinner • 18:00 - 20:00 Buffet Dinner in the Hotel
What is the 2006 Update? • Each working group reviews their tables only for any corrections or updates, based on the industry’s latest information • If a TWG needs to update figures or text, then report to IRC for discussion/approval. • 2006 Timeframe -- 2006 Update uses the 2005 ITRS 15-year timeframe: 2005 through 2020. • Use the WAS-IS format from the 2005 tables for those rows that need to be updated. • Each ITWG writes a 1-page summary of key changes/challenges for the 2006 Update. • These updates must be finished by September 2006
2006 ITRS Update Instructions Instructions cover the 2005 ITRS table line items that are updated, deleted, or added. • The word file of each TWG chapter is posted online at www.itrs.netand was sent to each team in January. [Ask your TWG chair] • Tables requiring revision can remain in Word or put into Excel spreadsheets for update by the TWG. • Update format must be maintained in order to see new revisions as follows: • Each table indicates 2005 line items that require revision as WAS, with duplicate rows beneath the WAS row for update if new data or correction for 2006 Update apply. • Each ITWG fills in this new IS row with the new data. • Deleted or new additional lines can also be indicated. • Deleted line items are noted as DELETE and with the data struck through. • New lines are noted as ADD and are located as they should be within a table. As added new information, these do not have WAS rows.
2006 ITRS Key Dates for IRC and ITWG Jan – Apr IRC, CrossTWG Study Group, and DTWG meetings ITWGs receive packets of 2005 chapter in Word, instructions for 2006 update. ITWGs work on review and update of tables only. [chapter text is NOT required to be updated!] ► Apr 5 – 7 ITRS ITWG/IRC meeting near Maastricht, the Netherlands at the Dolce Kasteel Vaalsbroek Jun 30 Group 1 tables due to Group 2 teams and the ITRS office Jun 30 Presentation Drafts due for preparing the July handout CD: 1 page text summary of key changes to tables and ~20 slides in powerpoint [do NOT send PDF…] ► Jul 10 – 11 ITRS ITWG/IRC meeting in San Francisco at the Hotel Marriott► Jul 12 ITRS Conference at the Hotel Marriott
2006 ITRS Key Dates for IRC and ITWG Jul 24 Group 2 tables are due to Group 1 and 3 teams and the ITRS office Aug 24 Group 3 chapters are due to Group 2 and 3 teams and the ITRS office Sep 15 2006 ITRS content is frozen Oct Regional Executives Advisory board approve ITRS Nov 10 Presentation Drafts due for preparing for December Public meeting CD ► Dec 4 ITRS ITWG/IRC meetings in Hsin Chu, Taiwan at the Ambassador Hotel ► Dec 5 ITRS Conference at the Ambassador Hotel Dec 2006 Update is posted online to the public.
2006 ITRS Working Groups • Group 1 ― System Drivers & Design, Process Integration, RF/AMS Wireless, ORTC • Group 2 ― Front-end Processes, Lithography, Interconnect, Assembly & Packaging, Test & Test Equipment, ORTC • Group 3 ― Emerging Devices, ESH, Yield Enhancement, Metrology, Modeling, Factory Integration, ORTC
CrossTWGSchedule Slide 11
CrossTWGSchedule Slide 12
CrossTWGSchedule Slide 13
ITRS Special Events • Electronics Manufacturers Summit webcast by Semiconductor International http://www.emsummit.com – April 18, 19, 20 • ASMC highlights on ITRS Boston, MA – May 22-24