MKI Work During Christmas TS Point 2: Week 49: magnet B, Tank #5, removed and Tank #10 installed

MKI Work During Christmas TS Point 2: Week 49: magnet B, Tank #5, removed and Tank #10 installed Week 49: magnet B, TMR changed (new head and MultiContact pickup) Week 49: survey Week 49: equipment remounted under magnet B Baked-out Sublimation carried out on both Tank 4 & Tank 10

audra-ford
Download Presentation

MKI Work During Christmas TS Point 2: Week 49: magnet B, Tank #5, removed and Tank #10 installed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MKI Work During Christmas TS • Point 2: • Week 49: magnet B, Tank #5, removed and Tank #10 installed • Week 49: magnet B, TMR changed (new head and MultiContact pickup) • Week 49: survey • Week 49: equipment remounted under magnet B • Baked-out • Sublimation carried out on both Tank 4 & Tank 10 • Valves around Tank #10 open and closed again to check operation (OK) • One of eight “electron-cloud bobbins” installed (near warm-cold transition and pumping port): • Equipment deconsigned (Thurs 13/1/2011). • TO DO: • Software changes to be verified; • Pulse conditioning (ACOND) & verify • waveforms; • Carefully monitor TMR C & PFN C voltages • and identify cause of voltage reduction • that occurred between Dec. 4-6, 2010 • (possibly in DS tank ……). LIBD: 14 Jan 2011

  2. MKI Work During Christmas TS • Point 8: • Week 49: magnet C, TMR changed (new head and MultiContact pickup) • Equipment deconsigned (Fri 14/1/2011). • TO DO: • Software changes to be verified; • Pulse conditioning (ACOND) and • verify waveforms. • Electron-cloud bobbins to be • installed. • Future Work for MKI’s? • Move Group Hydraulics pipes away from magnet interconnect B-C to permit use of VPIB pump? (no elbow, hence higher pumping speed and allows 3 valves on adjacent MKI tanks). LIBD: 14 Jan 2011