1 / 6

Exercício Resolvido – Aplicação do Cap. 1

Exercício Resolvido – Aplicação do Cap. 1. Dada a Instalação de Bombeamento. Dados: D LS = 0,250[m] e D LR = 0,200[m] e são dadas as perdas de carga. Linha de sucção:. Linha de recalque:. Dados ainda: a curva QxH da bomba para n = 1750rpm=Constante. SOLUÇÃO.

Download Presentation

Exercício Resolvido – Aplicação do Cap. 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Exercício Resolvido – Aplicação do Cap. 1 Dada a Instalação de Bombeamento Dados: DLS= 0,250[m] e DLR = 0,200[m] e são dadas as perdas de carga Linha de sucção: Linha de recalque:

  2. Dados ainda: a curva QxH da bomba para n = 1750rpm=Constante

  3. SOLUÇÃO a) – Determinação da curva da instalação • Determinação da equação da instalação Da equação da continuidade:

  4. Tabela

  5. b) – Determinação do ponto de operação 12,5 0,05

  6. c) – Determinação das alturas estática e dinâmica

More Related