UNDERGROUND (UX85)

OPEN DAYS - LIST OF MAIN TASKS TO DO. Guidelines. UNDERGROUND (UX85) 1 – Metallic Structures & Stairs : Drawings & Check mechanical calculations (J.F.H) 2 – Installation (new) gangway (+ stairs) in front of the shielding wall (D.L)

aurora
Download Presentation

UNDERGROUND (UX85)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPEN DAYS - LIST OF MAIN TASKS TO DO Guidelines UNDERGROUND (UX85) 1 – Metallic Structures & Stairs : Drawings & Check mechanical calculations (J.F.H) 2 – Installation (new) gangway (+ stairs) in front of the shielding wall (D.L) 3 – Adaptations & Modifications “garde-corps” & barriers (D.L) 4 – Miscellaneous : Lightings, Panels, Stickers, Storage, Cleaning, Painting,.. (B.C, S.L) 5 – Safety Issues : hand-rails, barriers, extinguishers, emergency routes,…..(E.T) SURFACE SITE 8 1 – Rearrangement of the storage areas (P.V. - on going) 2 – Cleaning of the routes + green spaces (P.V). 3 – Car places (P.V) 4 – Large LHCb Logo Poster (~ 6 x 3 m) – North (SZ8 Building) (D.L) SURFACE SX8 1 – Panels for Posters + Tables for exhibition the LHCb components (B.C) 2 – Rearrangement of the storage areas inside SX8 3 – Creation “cafeteria” space” in the front of the control room (B.C) 4 – Miscellaneous : Painting, Cleaning,………….. 5 – Safety Issues : access, barriers, extinguishers, emergency routes,….. (E.T) D.LACARRERE

More Related