LHCb - UX85 EXPT AREA RESTRUCTURING SAFETY DEVICES. SUMMARY (wks 30-35/09) AUGs : Repositioning (4) & additional AUGs (13) – 9 AUG chains instead of 2. Evacuation Switches (ES) : Repositioning (5) + additional ES (6) – (wk35)
E N D
LHCb - UX85 EXPT AREA RESTRUCTURING SAFETY DEVICES SUMMARY (wks 30-35/09) • AUGs : Repositioning (4) & additional AUGs (13) – 9 AUG chains instead of 2. • Evacuation Switches (ES) : Repositioning (5) + additional ES (6) – (wk35) • Red Telephones (RT) : Repositioning (4 on panel) + 4 additional RT on panel (wk35) • Regrouping AUG + ES + RT : 9 panels D.Lacarrère & E.Thomas
LHCb SAFETY PANEL(example) Safety Panel 10 August 2009 Photo D.LACARRERE D.Lacarrère & E.Thomas
CONCLUDING REMARK • CURRENT STATUS : ~ 80 % ACHIEVED • END EXPECTED FOR 31 August 2009 • GLOBAL TEST TO BE SCHEDULED (Sept. – Oct.09) D.Lacarrère & E.Thomas
APPENDIX • UX85A – Safety Devices (sheets 1,2,3 & 4) • UX85B – Safety Devices (sheets1,2,3) • UX85 CAVERN – Top view D.Lacarrère & E.Thomas
UX85-A – Safety devices (1) 1 2 3 4 5 6 7 8 3nd ITERATION D.Lacarrère & E.Thomas
UX85-A – Safety devices (2) 9 10 11 12 13 14 15 16 D.Lacarrère & E.Thomas
UX85-A – Safety devices (3) 17 18 19 20 21 22 23 24 D.Lacarrère & E.Thomas
UX85-A – Safety devices (4) 25 26 27 28 29 D.Lacarrère & E.Thomas
UX85-B – Safety devices (1) 30 31 32 33 34 35 36 37 D.Lacarrère & E.Thomas
UX85-B – Safety devices (2) 38 39 40 41 42 43 44 45 D.Lacarrère & E.Thomas
UX85-B – Safety devices (3) 50 51 52 53 54 31b D.Lacarrère & E.Thomas
ADDITIONAL AUGs & E Switches in UX85 Summary 11 10 15 37 38 7 14 36 6 13 25 24 35 40 41 39 1 27 32 26 45 44 20 33 17 2 3 43 16 42 34 18 31 30 4 21 31b 5 19 23 22 8 9 12 Emergency Panel Additional AUGs &/or E D.Lacarrère & E.Thomas