An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome To For Presentation on Preparation of Detailed Project Report on Development ofBharatpur- Deeg -Alwar Road (SH-14)

  2. Scope of DPR Services • Topographical Survey • Traffic Survey • Geotechnical Survey • Road & Pavement Investigation • Road Inventory Survey • Bridges & Culverts Investigations • Material Investigation • Detailed Design • Environmental & Social Impact Assessment • Estimation of Quantities & Project Cost • Economic & Financial Viability • Land Acquisition Report • Contract Document

  3. End of the Project– Alwar Dig Start of the Project- Bharatpur Key Plan

  4. Villages along Project Road • There are around 20 villages along the Project Road.

  5. i Total Length 91.600 Km Start Chainage – Km 2.700 on SH - 14 End Chainage – Km 94.300 on SH - 14 ii Existing Pavement width 7.0 m iii Major Bridges Nil iv Minor Bridges 4 No. v CD Work 41 Nos. vi Major junctions 10 Nos. vii Existing Bypass Nil viii Railway crossing Nil ix Public Amenities Petrol Pumps x Terrain Plain Salient Features of Existing Road (Inventory)‏

  6. xi Major Town Kumher Deeg Nagar xii Pavement Quality Fair to Good Salient Features of Existing Road (Inventory)‏

  7. Site Photographs Alignment through Kumher Alignment through Deeg Alignment through Nagar Causeway at River Jhajhar

  8. Proposed Typical Cross section

  9. Proposed Development Work – Scope of Contractor

  10. Proposed Development Work – Scope of Contractor

  11. Proposed Bypass – Kumher

  12. Proposed Bypass – Deeg

  13. Proposed Bypass – Nagar

  14. Civil Cost of Project (In Crores)‏ - 2 lane + hard shoulder Note: Cost is based on current Basic Schedule of Rates, NH Division.

  15. Traffic Studies

  16. Type Mode of Vehicle Ch: Km.3.200 Ch: Km.41.000 Ch: Km.71.000 Passenger Vehicles 2-Wheeler 5884 2175 3844 Auto 217 93 116 Car 5132 1180 1768 Bus 304 324 264 Commercial Vehicles LCV 545 258 732 2-Axle 897 223 491 3-Axle 161 282 396 Multi axle 51 52 116 Tractor 1571 347 54 Classified Traffic Volume Counts (Nos.)‏

  17. Vehicle Category (1)‏ Fee rate/ Veh/ trip for a length of 20 km (In Rs.)‏ (2)‏ Fee rate/ trip/km for a length >20 km. For up to 20 km Col. 2 is applicable (in Rs.) (3) Tractors with trolleys carrying agricultural products 5.08 0.13 Cars/ Taxis/Jeeps 16.94 0.42 Buses 42.35 1.09 Truck (<5 Tonnes)‏ 57.60 1.42 Truck (>5 Tonnes)‏ 86.39 2.16 Multi axle Trucks/ Trailors 142.30 3.58 Toll fees As Per PWD Notification-F8(50)/PW/2001/Part I/312 -30/3/2009 Toll Fare Car/Jeep/Passenger Van LCV Tractor Bus 2A-Truck MAV (>2 Axle)‏ Year 2010 Toll Plaza 1(Km 3.200) 20 75 5 55 115 185 Toll Plaza 2 (Km 41.00) 15 60 5 45 90 145 Toll Plaza 3 (Km 71.00) 25 85 5 60 125 210

  18. Projected Traffic

  19. Financial Cost – 2 LANING + HARD SHOULDER

  20. Financial Analysis - 2 LANING + HARD SHOULDER

  21. Approval Required • Land Acquisition • Tree Cutting Permission • Utilities Shifting • State Pollution Control Board • Environmental Clearance

  22. Thank You