An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Center for Innovative School Facilities Commissioning Re-Commissioning Retro-Commissioning Mike DiPasquale

  2. Introduction & Background

  3. Commissioning • The Cx agent is the part of the QA/QC process • Shouldbe independent of the design and construction management • Client’s eyes and ears

  4. Pre-Construction Activities • Review Basis of Design (BOD) and Owner Project Requirements (OPR)* • Develop and incorporate commissioning (Cx) requirements into the construction documents* • Perform a Cx review of the design documents** * LEED Fundamental ** LEED Enhanced

  5. Construction Activities • Develop and implement a Cx plan* • Review contractor submittals applicable to systems being Cx’d** • Perform installation verification of the systems to be Cx’d* (Pre-Functional) • Accessibility for service and maintenance • Meetings * LEED Fundamental ** LEED Enhanced

  6. Construction Activities • Verify performance of the systems to be Cx’d* (Functional Tests) • HVAC systems and associated controls system • Client standard sequence of operations, DDC graphics, equipment and point naming standards. • Lighting and Daylighting Controls • Domestic Hot Water System • Renewable Energy Systems (Photovoltaic, Solar Hot Water, etc.) • Other equipment/systems: Building Envelope, FSD’s, smoke evacuation, nurse call, security • Systems needing additional clarification: ‘Communication’, ‘IT/Data’ • Systems that may be Cx’d but may not bring the most value to the client (Fire Alarm, Elevators, Medical Gas) * LEED Fundamental ** LEED Enhanced

  7. Post-Construction Activities • Verify training requirements have been met** • Develop a systems manual** • ‘It Doesn’t Work” stage • Review operation of the building 8-10 months after substantial completion** * LEED Fundamental ** LEED Enhanced

  8. Post-Construction Activities • Final Report* • Executive summary • Scope of Services • OPR/BOD • Review comments • Cx plan • Pre-Functional documents • Equipment start up documents • Functional tests • Meeting minutes, field reports etc. • Cxpunchlist • Systems manual * LEED Fundamental ** LEED Enhanced

  9. Re-Commissioning

  10. Re-Commissioning

  11. Retro-Commissioning • Energy Trust Existing Buildings Program

  12. Retro-Commissioning

  13. Retro-Commissioning • VISN 20