Assessment of the potential value return from research topics Follow-up actions

Assessment of the potential value return from research topics Follow-up actions. ITRS Maastricht 04/07/06. Follow-up process. Start working now on the subject of “equivalent scaling parameters” Topic to be included in the TWG meetings Conference call early June

avi
Download Presentation

Assessment of the potential value return from research topics Follow-up actions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assessment of the potential value return from research topicsFollow-up actions ITRS Maastricht 04/07/06

  2. Follow-up process • Start working now on the subject of “equivalent scaling parameters” • Topic to be included in the TWG meetings • Conference call early June • Joint conf call with IRC / some TWG chairs • Summer meeting • Half-day workshop IRC / selected TWG chairs • Contact with other consortia • MEMS Industry group (A.Allan) • iNEMI (A.Allan, JA.Carballo) • IEEE (P.Gargini)

  3. To be discussed in the TWG meetings • Former approach • Economic value through dimensional scaling • Questions to you • What will pure continuous scaling bring ? • Which non-scaling parameters can you play on that will bring equivalent scaling value ? • Meeting system performance in another way • or bringing additional functionalities • How to characterize / evaluate them vs. scaling approach ? • Are there trade-offs involved between parameters (e.g., frequency vs. # of processors) ?

  4. Possible TWG involvement preparation/proposals for July ITRS • Assy & Packaging • System integration white paper • Passive integration • Design • Extension of roadmap / system drivers (example Automotive HV power, Sensors) • System on Chip / network on Chip • PIDS / Design • extending MASTAR to system level • Interconnect • Optical • Passive integration • RF Wireless • Passive integration • …

  5. Format proposal Don’t feel restricted by that format ! Thinking out of the box is welcome !