An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 IWG #25

  2. TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25

  3. TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25

  4. EGNOS Services Services Markets 2009 Location Based Services Professional Applications Road 2011 Maritime Rail 2012 Aviation IWG #25 4

  5. EGNOS Services related publications 14/06/2012 IWG #25 5 • EGNOS Service Definition Document (SDD) describing the characteristics and conditions of access to each EGNOS service. (EDAS, OS, SoL) http://www.essp-sas.eu/service_definition_documents • Service Notices generated whenever there is any complementary information to be provided to users that could affect any SDD content. Three Service Notices published (with several updates) http://www.essp-sas.eu/service_notices • EGNOS Performance reports: • Monthly Performance Reports www.essp-sas.eu/monthly_performance_reports • Yearly Service Provision Reports http://www.essp-sas.eu/printed_documents

  6. EGNOS OS SDD Publication • EGNOS OSService Definition Document (SDD) • v1.1 -> Published on October 30th2009 (ESR v2.2) • V2.0 -> Published on March18th2013 (ESR v2.3.1i) IWG #25

  7. IWG #25

  8. EGNOS SoL SDD Publication v1.0 v2.0 APV-I Availability (99%) Coveragearea EGNOS SoL Service Definition Document (SDD) v1.0 -> Published on March 2nd 2011 (ESR v2.2) v2.0 -> Planed to be published on June 2013 (ESR v2.3.1i) IWG #25

  9. EDAS Service • EDAS (EGNOS Data Access Service)provides through the Internet the data collected and generated by the EGNOS infrastructure on real time. • EDAS data is provided in different formats and protocols. • The main types of information provided by EDAS are: • GPS and GLONASS observations and navigation data collected by the entire network of RIMS and NLES stations NLES • EGNOS augmentation messages. IWG #25 9 9 9

  10. EDAS SDD Publication • EDAS Service Level 0 (ASN.1) • EDAS Service Level 1 (RTCM 3.0) • EDAS Service Level 2 (RTCM 3.1) • EDAS SISNeT Service • EGNOS GEO satellites messages broadcast using the SISNeT protocol • EDAS Data Filtering Service • Access to a subset of ServiceLevel 0/2 data (stationsgroups) • EDAS Ntrip Service • GPS/GLONASS observations and ephemerisinformationtransmittedusingtheNtripprotocol. • EDAS FTP Service • Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. AvailablesinceJuly 2012: EDAS SDD v1.0 IWG #25 10 10

  11. EDAS SDD Publication • EDAS Service Level 0 (ASN.1) • EDAS Service Level 1 (RTCM 3.0) • EDAS Service Level 2 (RTCM 3.1) • EDAS SISNeT Service • EGNOS GEO satellites messages broadcast using the SISNeT protocol • EDAS Data Filtering Service • Access to a subset of ServiceLevel 0/2 data (stationsgroups) • EDAS Ntrip Service • GPS/GLONASS observations and ephemerisinformationtransmittedusingtheNtripprotocol. • EDAS FTP Service • Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. • AvailablesinceApril 2013: • EDAS SDD v2.0 IWG #25 11 11

  12. TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25

  13. LPV Implementation status • March 2013: • 1 LPV procedure in Switzerland: Berne-Belp (LSZB) • 1 LPV procedure in France: Grenoble Isere (LFLS) • April 2013: • 1 LPV procedures at Metz Nancy Lorraine • May 2013: 7 new LPVs procedures in France • 1 LPV procedure at Colmar Houssen airport on 2 May 2013 • 1 LPV procedure at Nancy Essey airport on 2 May 2013 • 2 LPV procedures at Paris Orly airport on 30 May 2013 • 2 LPV procedures at Rennes airport on 30 May 2013 • 1 LPV procedure at Epinal Mirecourt airport on 30 May 2013 • Planned for June 2013 • 1 LPV procedure in at Roma/Fiumicino airport (Italy) • 1 LPV procedure in at Venezia/Tessera airport (Italy) • Planned for July 2013 • 1 LPV procedure in at Grenchen airport (Switzerland) IWG #25 30/05/2013

  14. LPVsimplementationstatus and forecast(June 2013) (coordinatedwithEurocontrol) IWG #25 30/05/2013

  15. LPV ImplementationStatus EGNOS-basedproceduresimplementationmap and detailedlistincluded in the ESSP website www.essp-sas.eu IWG #25

  16. Questions? IWG #25 16

  17. Thanks! EVENT TITLE 26 Oct 2009 17