170 likes | 354 Views
EGNOS Services and LPV Implementation. IWG #25 St Petersburg, June 2013. TABLE OF CONTENT. EGNOS Services Status LPV Implementation status. TABLE OF CONTENT. EGNOS Services Status LPV Implementation status. EGNOS Services . Services. Markets. 2009. Location Based Services.
E N D
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 IWG #25
TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25
TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25
EGNOS Services Services Markets 2009 Location Based Services Professional Applications Road 2011 Maritime Rail 2012 Aviation IWG #25 4
EGNOS Services related publications 14/06/2012 IWG #25 5 • EGNOS Service Definition Document (SDD) describing the characteristics and conditions of access to each EGNOS service. (EDAS, OS, SoL) http://www.essp-sas.eu/service_definition_documents • Service Notices generated whenever there is any complementary information to be provided to users that could affect any SDD content. Three Service Notices published (with several updates) http://www.essp-sas.eu/service_notices • EGNOS Performance reports: • Monthly Performance Reports www.essp-sas.eu/monthly_performance_reports • Yearly Service Provision Reports http://www.essp-sas.eu/printed_documents
EGNOS OS SDD Publication • EGNOS OSService Definition Document (SDD) • v1.1 -> Published on October 30th2009 (ESR v2.2) • V2.0 -> Published on March18th2013 (ESR v2.3.1i) IWG #25
EGNOS SoL SDD Publication v1.0 v2.0 APV-I Availability (99%) Coveragearea EGNOS SoL Service Definition Document (SDD) v1.0 -> Published on March 2nd 2011 (ESR v2.2) v2.0 -> Planed to be published on June 2013 (ESR v2.3.1i) IWG #25
EDAS Service • EDAS (EGNOS Data Access Service)provides through the Internet the data collected and generated by the EGNOS infrastructure on real time. • EDAS data is provided in different formats and protocols. • The main types of information provided by EDAS are: • GPS and GLONASS observations and navigation data collected by the entire network of RIMS and NLES stations NLES • EGNOS augmentation messages. IWG #25 9 9 9
EDAS SDD Publication • EDAS Service Level 0 (ASN.1) • EDAS Service Level 1 (RTCM 3.0) • EDAS Service Level 2 (RTCM 3.1) • EDAS SISNeT Service • EGNOS GEO satellites messages broadcast using the SISNeT protocol • EDAS Data Filtering Service • Access to a subset of ServiceLevel 0/2 data (stationsgroups) • EDAS Ntrip Service • GPS/GLONASS observations and ephemerisinformationtransmittedusingtheNtripprotocol. • EDAS FTP Service • Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. AvailablesinceJuly 2012: EDAS SDD v1.0 IWG #25 10 10
EDAS SDD Publication • EDAS Service Level 0 (ASN.1) • EDAS Service Level 1 (RTCM 3.0) • EDAS Service Level 2 (RTCM 3.1) • EDAS SISNeT Service • EGNOS GEO satellites messages broadcast using the SISNeT protocol • EDAS Data Filtering Service • Access to a subset of ServiceLevel 0/2 data (stationsgroups) • EDAS Ntrip Service • GPS/GLONASS observations and ephemerisinformationtransmittedusingtheNtripprotocol. • EDAS FTP Service • Historical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX. • AvailablesinceApril 2013: • EDAS SDD v2.0 IWG #25 11 11
TABLE OF CONTENT • EGNOS Services Status • LPV Implementation status IWG #25
LPV Implementation status • March 2013: • 1 LPV procedure in Switzerland: Berne-Belp (LSZB) • 1 LPV procedure in France: Grenoble Isere (LFLS) • April 2013: • 1 LPV procedures at Metz Nancy Lorraine • May 2013: 7 new LPVs procedures in France • 1 LPV procedure at Colmar Houssen airport on 2 May 2013 • 1 LPV procedure at Nancy Essey airport on 2 May 2013 • 2 LPV procedures at Paris Orly airport on 30 May 2013 • 2 LPV procedures at Rennes airport on 30 May 2013 • 1 LPV procedure at Epinal Mirecourt airport on 30 May 2013 • Planned for June 2013 • 1 LPV procedure in at Roma/Fiumicino airport (Italy) • 1 LPV procedure in at Venezia/Tessera airport (Italy) • Planned for July 2013 • 1 LPV procedure in at Grenchen airport (Switzerland) IWG #25 30/05/2013
LPVsimplementationstatus and forecast(June 2013) (coordinatedwithEurocontrol) IWG #25 30/05/2013
LPV ImplementationStatus EGNOS-basedproceduresimplementationmap and detailedlistincluded in the ESSP website www.essp-sas.eu IWG #25
Questions? IWG #25 16
Thanks! EVENT TITLE 26 Oct 2009 17