MSG PROGRAMME STATUS

MSG PROGRAMME STATUS. Presentation to the GIST-24 meeting. CURRENT SITUATION (as of 12 December 2005). MSG-1 No major satellite anomalies were reported during since the last GIST MSG-2 Nominal launch date 21 December 2005. MSG-2 Commissioning Outline

avon
Download Presentation

MSG PROGRAMME STATUS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MSG PROGRAMME STATUS Presentation to the GIST-24 meeting

  2. CURRENT SITUATION (as of 12 December 2005) MSG-1 • No major satellite anomalies were reported during since the last GIST MSG-2 • Nominal launch date 21 December 2005

  3. MSG-2 Commissioning Outline Satellite location during commissioning MSG-2 : 6.5°W ± 0.4°W, inclination > 1° MET-8 (MSG-1) : 3.4 ± 0.25°W MET-7 : 0° MET-6 : 10°E GERB will start commissioning ~6 weeks after launch, unless this corresponds to the Sun avoidance season MSG-2 planned entry into operational service August 2006 after relocation to 0° MSG-2 Commissioning (as of 12 December 2005)

  4. MSG-2 Commissioning (as of 12 December 2005)

  5. Commissioning GERB Details week 5 2006 Functional Commissioning 02-03/02/06 First GERB Images available week 6 2006 Calibration and Validation start 11/02/06 - 26/04/06 Spring sun avoidance : GERB Mode = SAFE (TBC) MSG-2 Commissioning (as of 12 December 2005)

  6. Commissioning SEVIRI Details 24/01/06 SEVIRI First Image 20/02/06 - 03/03/06 SEVIRI Alternative Repeat Cycles 24/02/06 - 15/04/06 Solar Scan period : GERB mode = SUNBLOCK or SAFE 13/03/06 Space Scan : GERB mode = SUNBLOCK or SAFE 14/03/06 Short Lunar Scan : GERB mode = CALx (TBC) 14/03/06 - 18/06/06 24h Lunar Scan period : GERB mode = SUNBLOCK or SAFE (TBC) 22/03/06 Start of Image dissemination 24/05/06 Start of Product dissemination 30/06/06 Start of Routine Operations 01/08/06 Entry into operation MSG-2 Commissioning (as of 12 December 2005)

  7. Commissioning Preparation MSG-2 Commissioning Rehearsals ran at EUMETSAT on OPE environment Testing of the upgraded leased line interface from EUMETSAT to RAL for dual data stream (MSG-1 & 2) on OPE environment Operational implementation of sftp for TSOL jitter data transfer from EUMETSAT to RAL Installation of GERB Tools on GERB EGSE at EUMETSAT for MSG-1 operations Upgrades to EUMETSAT procedures for commissioning completed MSG-2 Commissioning (as of 12 December 2005)

  8. GERB-2 operational news since the last GIST 15 May - Commercial Power outage at EUMETSAT - SEVIRI to Standby 15-20 June - First N-S Manoeuvre 4 July - GERB switched to ROM mode to test IMPF packet counter anomaly 22 July - Commercial Power outage at EUMETSAT - SEVIRI to Standby 18 Aug - 29 Oct - GERB in SAFE mode for sun avoidance season - no problems encountered with switch to DSM rotation modes 31 Aug - SEVIRI HRV lower window switched to track illuminated area of earth 23 November UPS test - GERB Router connection to UPS unplugged, otherwise no problems reported 04 Dec - GERB IOU Temperature OOL - satellite is reaching predicted end of life temperatures GERB OPERATIONAL DETAILS (as of 12 December 2005)

  9. GERB-2 AutoSAFE Anomaly Review Update Telemetry anomaly signatures have been identified. A test programme using the GERB DM DSM has been initiated to assess the potential causes of the anomaly. A patch to increase the speed of the the QFM movement to blocked will be tested in December 2005 for use on GERB-1/2. Initial analysis seems to indicate a low risk of contamination from the greased bearing design partially tested in parallel with the baseline GERB bearing. Review board is expected to come up with recommendations for GERB-1/2 and GERB-3/4 early next year following results from the planned tests. GERB OPERATIONAL DETAILS (as of 12 December 2005)

  10. Planned Activities Addition of TSOL jitter information onto the GERB data packet sent from EUMETSAT to RAL (partially complete) Migration of IMPF to GGSPS data transfer to sftp (TBC) Changes to MSG-1 GERB sun avoidance operations (TBC) Back-up ftp transfer of MSG-2 data from GERB EGSE GERB OPERATIONAL DETAILS (as of 12 December 2005)

  11. GERB-1 Integrated on MSG-2. GERB-3 IEU & IUH incorporated into GERB-4 Backup. The IEU will be further modified for improvements to the DSM timing. IOU will be stored under a dry nitrogen environment in RAL from Jan 2006 . GERB-4 GERB-4 backup available (GERB-3 IEU & IUH + STM IOU). GERB-4 expected to be delivered mid-Jan 2006. After satellite AIT it will be returned to RAL for detector replacement (TBC) and storage. OTHER GERB INSTRUMENTS (as of 12 December 2005)

  12. Spring Sun Avoidance Season MSG-1 GERB sun avoidance season: 14 Feb - 23 Apr MSG-2 GERB sun avoidance season: 11 Feb - 26 Apr MSG-1 GERB protection mechanisms: satellite safe function patch; GERB QFM patch (TBC); pixel thresholds MSG-2 GERB protection mechanisms: satellite safe function patch (TBC); GERB QFM patch (TBC); pixel thresholds; battery modification Question: Given the desire to perform GERB-1 & 2 cross calibration and data collection for AMMA and the risk that the GERB-1 and 2 DSM anomaly is likely to reoccur without much warning. Does GIST have a preference for GERB-1 & 2 operations during their respective sun avoidance seasons? GERB Parallel Operations (as of 12 December 2005)

  13. Future Dual Satellite Operations During the MSG-2 commissioning period and following MSG-2 relocation to 0° there is likely to be periods of parallel MSG-1 and 2 SEVIRI imaging. It is assumed that GERB will also be operated during these periods (baring sun avoidance restrictions). EUMETSAT are currently investigating the introduction of a rapid scan service for MSG (based on the MTP service) where a limited portion of the earth is scanned at a higher repeat rate. Questions: Is GERB data without SEVIRI images of any value? How should GERB be operated on a satellite performing SEVIRI rapid scans? GERB Parallel Operations (as of 12 December 2005)