Safer Start. 8am Monday 08 th February – 8am Monday 15 February. The Need to Change. Challenges in relation to patient flow both within the hospital and across the whole Health and Social Care system.

aysel
Download Presentation

Safer Start

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safer Start 8am Monday 08th February – 8am Monday 15 February

  2. The Need to Change • Challenges in relation to patient flow both within the hospital and across the whole Health and Social Care system. • Fire fighting daily with issues such as high bed occupancy levels, delayed discharges, outliers and long bed waits. • Overcrowding in ED becomes the norm. • Consistently declaring ‘Black’ status This is detrimental to patient safety, quality of care and negatively impacts on the patient experience.

  3. The Components of Safer Start

  4. Command and Control:Summary of Gold Actions:

  5. Command and Control:Summary of Silver Actions:

  6. Command and Control:Summary of Bronze/WLO Actions:

  7. Your Role:

  8. Your Role:

  9. Structure of the Day: Morning

  10. Structure of the Day: Afternoon

  11. KPIs: • Based on the SAFER discharge bundle for each area • Will be reported against at each Silver Command Meeting • Will be added onto Kitbag under a specifically set up for the week to allow us to track performance • Performance against these will determine plans for each CBU for the following day

  12. SAFER Discharge Bundle (key components): S - Senior Review. Consultant on ward for board handover at 0800 hrs A - Assessment. All patients will have a Planned Discharge Date and management plan within 24 hours of arrival to ward. F - Flow of patients. Wards will commence ‘pull’ the correct patients to their ward before 10am. Pull to beds will occur within 30 mins of declaration. E – Early discharge. Discharge targets commence from 10am and patients should leave ward within 2 hours of decision to discharge made R – Regular review. A systematic review of patients with extended lengths of stay. Review of every patient by Consultant.

  13. Questions…..