1 / 5

Feedback from ACDC3

Feedback from ACDC3. Kazu Akiba. Data Flow. 12 Tell1s plus Odin put together on the crate NZS Data: 4~5kBx12 per event: 2.0 kEvent/s max DAQ with 1 PC. Tested with MEP factor up to 4 (NZS) and 15 (ZS) Too many packets to route: 1 switch is not enough for the Velo (HP 3400) 2 HP3400 work!

azize
Download Presentation

Feedback from ACDC3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Feedback from ACDC3 Kazu Akiba

  2. Data Flow • 12 Tell1s plus Odin put together on the crate • NZS Data: 4~5kBx12 per event: • 2.0 kEvent/s max DAQ with 1 PC. • Tested with MEP factor up to 4 (NZS) and 15 (ZS) • Too many packets to route: • 1 switch is not enough for the Velo (HP 3400) • 2 HP3400 work! • 1 to funnel, the next one to route. • Works, but without Jumbo frames. • Artur brings the peacemaker: • HP5412 handles the job with no problems.

  3. Controls Software • Velo Front-end, Tell1s, Odin, Hughin and Velo Temperatures controlled by PVSS • DIM_DNS_NODE was quite busy… • ISEG HV and CAEN LV software from the company • Conservative approach. • Cooling monitoring as stand alone application (LabView)

  4. Issues • Tell1 individual FSM does not check if the CCPC is alive: configuration fails. • Network interface on lbh8lx02 started to give up (required a sudo service network restart from time to time towards the end of the test beam.) • EB has a small dead time when closing or opening a new file. • Optical failure leads to some asynchronization: dangerous with 1 DAQ PC. • Some aparent asynchronization between Odin and Tell1s… To be confirmed.

  5. Before  After 4000 86

More Related