1 / 6

SC8 Liaison Report

SC8 Liaison Report. API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick. SC8/TG1 . Coverage – API SPEC 4F & RP 4G Chair – Mark Trevithick Document Status Spec 4F 4 th ed . published January, 2013, effective August 1, 2013

baby
Download Presentation

SC8 Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick

  2. SC8/TG1 • Coverage – API SPEC 4F & RP 4G • Chair – Mark Trevithick • Document Status • Spec 4F 4thed. published January, 2013, effective August 1, 2013 • RP 4G published April, 2012 • Ongoing Activity – • 4th edition includes Processes Requiring Validation • Clarification of Structural Safety Level and design wind velocity.

  3. SC8/TG2 • Coverage – API SPEC 7K and RP 7L • Chair – Shawn Firenza • Document Status • Spec 7K 5th ed. published June, 2012. Spec 7K 6th ed. Draft in progress. • RP 7L, reaffirmed August, 2012 • Ongoing Issues – • Purchasing Guideline Draft in process, expect letter ballot in the fall. • Processes Requiring Validation Ballot Resolved, changes to be published in the 6th ed. • Letter Ballot to remove power tongs from scope of covered equipment.

  4. SC8/TG3 • Coverage – API SPEC 8A, 8C, & RP 8B • Chair – Ken Kondo • Document Status • Spec 8C 5th ed. published April, 2012 • RP 8B reaffirmed August, 2012 • Ongoing Issues – • Purchasing Guideline Draft in process, expect letter ballot in the fall • Spec 8A withdrawal notification issued August, 2012. All licenses withdrawn February 1st, 2013.

  5. SC8/TG4 • Coverage – API SPEC 7F, 9A & RP 9B • Chair – Dennis Fetter • Document Status • Spec 7F 8th ed. published November, 2010 • Spec 9A 26th ed. published May, 2011. Errata published October, 2012 • RP 9B 13th ed., published October, 2011. Errata published April, 2012, and January, 2013 • Ongoing Issues – • RP 9B revisions in progress to give better guidance on wire rope inspection.

  6. SC8/TG5 • Coverage – API 7HU1 • Chair – Cindy Taff and Jason Shell • Document Status • API 7HU1, 1sted. Published May 2009 • Ongoing Issues • Working on Hammer Union specification • We expect the TG will probably vote to reaffirm 7HU1 when they meet later this year.

More Related