80 likes | 251 Views
802.21 Liaison Report. Authors:. Date: 2013-11-14. Abstract. Liaison report on 802.21 as presented to 802.11. 802.21 Framework. Slide 3. Slide 3. Clint Chaplin, Samsung Electronics. 802.21.1 Services (SAUC). There were five presentations on use cases:
E N D
802.21 Liaison Report Authors: Date: 2013-11-14 Clint Chaplin, Samsung Electronics
Abstract Liaison report on 802.21 as presented to 802.11 Clint Chaplin, Samsung Electronics
802.21 Framework Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
802.21.1 Services (SAUC) There were five presentations on use cases: https://mentor.ieee.org/802.21/dcn/13/21-13-0196-00-SAUC-mih-service-use-cases-for-network-assisted-d2d-communication-of-service-providers-and-network-operators.pptx https://mentor.ieee.org/802.21/dcn/13/21-13-0197-00-SAUC-mih-service-use-cases-for-dynamic-frequency-channel-allocation-of-ieee-802-11-wlans.pptx https://mentor.ieee.org/802.21/dcn/13/21-13-0198-00-0000-review-on-user-authentication-problem-of-handover-between-heterogeneous-networks.doc https://mentor.ieee.org/802.21/dcn/13/21-13-0198-00-0000-review-on-user-authentication-problem-of-handover-between-heterogeneous-networks.doc https://mentor.ieee.org/802.21/dcn/13/21-13-0218-00-SAUC-onf-wireless-mobility-use-case-proposal.pptx Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
802.21c (srho)Single Radio Handover Task Group Initial Sponsor ballot on: IEEE P802.21c/D06 from Oct 14 to Nov 13, 2013 75 eligible to vote 63 votes received (84% returned) 55 affirmative, 4 negative, 4 abstain. Affirmative rate: 93% Result: approved. 60 comments: 28 compulsory 6 more editorial comments to be added All comments are resolved as shown in comments resolution file (21-13-0219-01) Recirculation Sponsor Ballot opening soon Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
802.21d (MuGM)Multicast Group Management Task Group Chair: Yoshihiro Ohba (Toshiba) WG ballot on: IEEE P802.21d/D02 from October 1 to October 22, 2013 8 approve, 7 disapprove, 1 abstain. Result: not approved. 179 comments All but 9 comments resolved BRC appointed Recirculation in early January 2014 Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
802.21m (REVP)802.21-2008 Revision Project Chair: Charlie Perkins (Futurewei) Created document for base 802.21m specification Created document for 802.21.1 handover services specification Issues added to spreadsheet based on comment rejections from 802.21c and 802.21d Reviewed text included as part of base 802.21m specification Received document source for 802.21a and 802.21b Discussed inclusion of text from 802.21b and 802.21a in base (802.21m) specification Received framemaker (.tif) source for document figures Reviewed 802.21m charter and mission Reviewed previous decisions, work plans Discussion of issues spreadsheet 21-13-0182-01-REVP Review proposed terminology change No discussion of Protocol Mandates or Gap Analysis Discussed problems with document source as received Reviewed current split of 802.21-2008 specification 21-13-0210-00-REVP-802.21-2008_include 21-13-0211-00-REVP-802.21-2008_exclude Discussed submission of handover as use case to 802.21.1 Discussed handling of 802.21a and 802.21b Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
References This document Thanks to Subir Das, Chair of 802.21 All Documents https://mentor.ieee.org/802.21/documents Current draft is in the members-only area http://www.ieee802.org/21 Members_Only_Area 802.11 members log in using 802.11 username and password Slide 8 Clint Chaplin, Samsung Electronics