WELCOME. AUTOMATIC DAM WATER LEVEL CONTROLLER USING BELLOWS VALVE. PROJECT TEAM. G.GOVARDHAN. (Reg.no:85909144505) M.Kanagaraj . (REG.NO:85909144508) R.SATHISH KUMAR (REG.NO:85909144517) D.MANIKANDAN. (REG.NO:85909144510). PROJECT GUIDE.
E N D
AUTOMATIC DAM WATER LEVEL CONTROLLER USING BELLOWS VALVE PROJECT TEAM G.GOVARDHAN. (Reg.no:85909144505) M.Kanagaraj. (REG.NO:85909144508) R.SATHISH KUMAR (REG.NO:85909144517) D.MANIKANDAN. (REG.NO:85909144510) PROJECT GUIDE Mr.G.SURENDAR.,BE.,M.Tech.,
ABSTRACT The objective of this project is to control the water level in dam using bellows valve . If water level increases the desired level then it will valve open. If it decreases the desired level then it should turn off the valve automatically.in this project automatic dam control using bellows valve
INTRODUCTION NEED FOR AUTOMATION: • Nowadays almost all the automobile vehicle is being atomized in order to product the human being. The automobile vehicle is being atomized for the following reasons.
To achieve high safety • To reduce man power • To increase the efficiency of the vehicle • To reduce the work load • To reduce the vehicle accident • To reduce the fatigue of workers • To high responsibility • Less Maintenance cost
commons.wikimedia.org Dam_with_water.jpg
ibrary.thinkquest.org BigDam(E).gif
LITRATURE SURVEY ^ Ramakrishnan, Uma; Santosh, J. A. ; Ramakrishnan, Uma & Sukumar, R. (25 January 1998). "The population and conservation status of Asian elephants in the Periyar Tiger Reserve, Southern India ^ Mathew, R.O.Y. (7 December 2011 The hidden control defines a hidden field and is rarely used. No field is rendered in the dialog and the control itself does not have any properties of its own. The only relevant generic property is defaultValue.
Cast steel PM 25 to ANSI 300 – 1/2 to 12 inchesStraight-through or Y-pattern designEasy operating handwheel with safe operation at all working temperaturesEnergy-saving bell of chrome nickel steel with air cushion between bell and housingBellows of chrome-nickel steel
Working progress: • December :we have select the project title • January : Materials collecting • February : Abstract ,project details collecting through internet • March : Record work and fabrication will be submitted.
BLOCK DIAGRAM battery Dam Sensing unit Exit Bellows valve