1 / 5

bnl - fnal- lbnl - slac

US LHC Accelerator Research Program. bnl - fnal- lbnl - slac. LHC 10 m D2 Magnet 100 mm or 105 mm very preliminary cost and schedule estimates 29 June 2012 M. Anerella. 100 mm D2 schedule. 100 mm D2 Cost Summary. 105 mm D2 schedule. 105 mm D2 Cost Summary.

bat
Download Presentation

bnl - fnal- lbnl - slac

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US LHC Accelerator Research Program bnl - fnal- lbnl - slac LHC 10 m D2 Magnet100 mm or 105 mmvery preliminary cost and schedule estimates29 June 2012 M. Anerella

  2. 100 mm D2 schedule 2

  3. 100 mm D2 Cost Summary 3

  4. 105 mm D2 schedule 4

  5. 105 mm D2 Cost Summary 5

More Related