1 / 15

Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee

Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee. CMBG Mission.

Download Presentation

Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Configuration Management AP-929, Revision 1Mike StoutChairmanCMBG Steering Committee Cleveland 2005

  2. CMBG Mission “To provide a forum for the exchange of information which is useful to practitioners of nuclear facility configuration management and to act as the CM Community of Practice for the nuclear industry. Cleveland 2005

  3. Community of Practice • A Community of Practice (CoP) is an industry peer group of experts in a process or sub-process defined in NEI’s Standard Nuclear Performance Model. The group serves as the owner of that particular process or sub-process, managing the solution of issues for the industry in that area. NEI assesses CoP development based on six attributes: formation of a leadership team, a charter, cost definitions, process descriptions, definitions of performance indicators and performance improvement projects. Cleveland 2005

  4. Industry CM Issues • Margin Management • Fuel Performance • Performance Indicators • New NRC Engineering Inspections • IT cost/benefit • Process Orientation • Eastern European plants and risk Cleveland 2005

  5. Current Initiatives • Planning for 2006 CMBG conference (June) in Richmond hosted by Dominion Energy. • Integrate CM/IM/IT Processes and resolve interface conflicts. • Complete revision to INPO AP-929 using CM Process model that agrees with NEI Standard Nuclear Performance Model • Pilot program to make CM performance indicators “workable and visible” Cleveland 2005

  6. AP-929 Team • Gary Bal- INPO • Mike Stout- Spescom Software, Inc. • Keith Reinsmith- PPL Susquehanna • Rick Harris- Duke • John Parler- VC Summer • Bob Hess- Diablo Canyon • Larry Kidd- Dominion Energy • Tom Czerniewski- Indian Point Cleveland 2005

  7. Project Motivation • CMBG 2001 Participants wanted focus on ANSI/NIRMA CM 1.0-2000 concepts and terminology • ANSI standard addresses “Objectives” and program elements • Worked with NEI on SNPM • Now working with INPO on AP-929 Cleveland 2005

  8. Cleveland 2005

  9. CM Process Model • High level model • integrated processes used to return to CM ‘objective’ when change occurs. • developed in early 2002 by CMBG task force. • influenced content of industry guidance documents: • NEI Standard Nuclear Performance Model • INPO Operation Excellence Outcomes enablers • used by CMBG to develop CM Performance Indicators • AP-929 further details this model Cleveland 2005 11

  10. CM Process Model ChangeDesignRequirements? ChangePhysicalConfiguration? ChangeFacilityConfigurationInformation? EvaluateIdentifiedProblem orDesiredChange * CM sub-processes agree with NEI Standard Nuclear Performance Model DoNothing More No No No CM Equilibrium Yes Yes Yes CM001* DesignRequirementsChange Process Physical ConfigurationChangeAuthorizationProcess Facility ConfigurationInformationChange Process CM002 * CM003 * CM004 * Cleveland 2005

  11. TABLE OF CONTENTS FOREWORD TABLE OF CONTENTS FEEDBACK AND COMMENTS PROCESS INTEGRATION DEFINITIONS CONFIGURATION MANAGEMENT OBJECTIVES CONFIGURATION MANAGEMENT PROCESS FLOWCHART CONFIGURATION MANAGEMENT ACTIVITY DEFINITION APPENDICES Cleveland 2005

  12. DEFINITIONS As-built As-designed As-found Authorization Basis Information Design Authority Design Bases Design Information Design Input Design Output Design Requirement Cleveland 2005

  13. DEFINITIONS (continued) Facility Configuration Information Graded Approach Non-conformance Operational Configuration Operational Configuration Information Physical Configuration Structure, System, or Component Cleveland 2005

  14. APPENDICES A Flowcharting Conventions B Design Basis C Well Managed Margins D Plant Modification Process Example E Performance Indicators F References Cleveland 2005

  15. Team met at INPO in late August 2004 Model and outline completed Added a level of detail to model Mod example moved to Appendix Review by team complete. INPO review cycle, editorial changes. Will be on INPO website for comment Will notify all in CMBG database Expect issue by 3rd Qtr 2005. AP-929 revision status Cleveland 2005