1 / 9

SPAR Technology Achieving Life Cycle Performance and Cost Risk Reduction

SPAR Technology Achieving Life Cycle Performance and Cost Risk Reduction Through Advanced Sustainment Modeling and Simulation OMDEC Partners Conference. 29 October 2007. Clockwork Solutions, Inc. Corporate Mission Statement.

benard
Download Presentation

SPAR Technology Achieving Life Cycle Performance and Cost Risk Reduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPAR Technology Achieving Life Cycle Performance and Cost Risk Reduction Through Advanced Sustainment Modeling and Simulation OMDEC Partners Conference 29 October 2007 Clockwork Solutions, Inc.

  2. Corporate Mission Statement Provide reliability centered, Performance Prediction and Risk Management Solutions to assist defense and industry in making intelligent supportability decisions that will result in minimizing asset downtime, loss of production and inefficient use of associated support resources.

  3. Company Information • US Corporation Since 1993 • Parent Company in Israel • Clockwork Solutions, Ltd. • Formula Vision • 35 Employees • Engineers • Mechanical, Chemical, Industrial • Nuclear • Statisticians / Mathematicians • Logisticians/Data Analysts • Programmers • Revenues Generated from both Software and Consulting Services

  4. SPAR Technology • Clockwork’s proprietary, Monte Carlo Simulation based technology • A Unique model building platform • A basis for industry-specific applications It effectively handles questions such as: • Spares Quantities/Locations • System / subsystems availability • Production performance • Plant design alternatives • Fleet readiness • Repair Scope

  5. World Wide Presence Royal Dutch/Shell Group UNA (Power)GE Plastic Royal Dutch Air Force NETHERLANDS ABB Group ALSTOM Mowag SWITZERLAND ZF ABB Nukem Thyssen-Krupp TUV GERMANY Ansaldo ENEA GE Oil & Gas ITALY US Army – Utility Helicopter Sikorsky Aircraft (S-92, H-60) Bell Helicopter (5 Helo Types) GE Aircraft Engines (T700) BAE (DECU/History Counter) Raytheon (IDS/RMS) USMC (Ground) Lockheed-Martin ALC GE Power Systems FAA Honeywell ConocoPhillips American National Power Bechtel Dow Chemical BASF US AF Missile Defense Agency NG Ship Systems UNITEDSTATES BMT (SABR) National Power British Army British MoD EADS Astrium Midlands Electricity General Dynamics LSC UK Japan Energy Fuji Oil JAPAN GEC-Alsthom EdF GdF Cegelec FRANCE Electric Corp IDF IAI Elta Rafael Elbit ECI Telecom ISRAEL Ministry of Defense SINGAPORE EIS DSTO Sydac AUSTRALIA Eskom Denel Columbus Steel SOUTH AFRICA

  6. Log Functions Systems Configurations/Status End Items / Spares Locations/Age/Status Time-based Forecasts Availability Model Input Data Legend Operations Achieved Operations Spares Unavailability Failures and Life Limit Events Operating Programs Stock Levels • - Engineering • Supply • Maintenance • - Operations Spares Locations Assembly Ages And Repair History Spare Pre-positioning Forward Maintenance Supply Breakdown Structures WUC’s and PN’s Repair Locations, Rules/DOF, Capacity, Cycle Time Order Lead Times Repair Turn Around Shipment Times Tasks Performed Awaiting Parts Occurrences Depot Maintenance Items Condemned Awaiting Maintenance Occurrences Arrivals to Depot Unique, Asset-based, Closed Loop Simulation Initialization

  7. Advanced Total Life-cycle Assessment Software Tool (ATLASTTM) • A Completed Model Representing the Life Cycle Characteristics of Aviation and Non-Aviation Systems • Predicting Aircraft and Fleet Support Requirements Due to: • Multiple Aircraft Types, Operating Locations and Profiles • Actual Age (Hours) on Components • Actual Repair History of Components • LRU/SRU Aging • Reliability Growth / Repair Effectiveness • Many other “Realities” • Metrics • Spares Consumption, Spares Availability, Operational Availability, LRU Removals in Field, Repair Turn Around, Maintenance Tasks Performed, others.

  8. Discrete Event Simulation (SPAR-Based) Technology Transmission & Distribution Defense SPAR / SPAROpt VisualSPAR SuperSPAR Ship Systems Power Generation Refining & Petro-Chemical

  9. Naaman Gurvitz, VP Research and Development Clockwork Solutions, Inc.115 Wild Basin Road (S), Suite 301Austin, Texas 78746-3303512-338-1945 (voice)512-338-1946 (fax)www.clockwork-solutions.com

More Related