10 likes | 151 Views
LBE/LBS : history. *: operational specifications were « give visual results on a pulse-to-pulse basis» and « measure time- dependent variation of D W» (Linac1 had enormous problems of beam loading compensation). Linac1 original configuration (1960).
E N D
LBE/LBS : history *: operationalspecificationswere «givevisualresults on a pulse-to-pulse basis» and «measure time-dependent variation of DW» (Linac1 hadenormousproblems of beamloading compensation) Linac1 original configuration (1960)