POWERGRID. Report on Readiness for ERP By POWERGRID. MDI, Gurgaon 17 JAN 2003 . POWERGRID. Are we ready to go for ERP System ??? An Introspective Expression. POWERGRID the Central Transmission Utility The largest Transmission entity in the world (42000+ ckms, 75 Sub stations)
E N D
POWERGRID Report on Readiness for ERP By POWERGRID MDI, Gurgaon 17 JAN 2003
POWERGRID Are we ready to go for ERP System ??? An Introspective Expression
POWERGRID the Central Transmission Utility The largest Transmission entity in the world (42000+ ckms, 75 Sub stations) Annual TO – Over 2500 Crores with Net Profit of over 640 Crores A Miniratna Company Diversified into Telecom on Converged Communication System of ULDC The manager of real time load despatch and communication system Introduction
Availability of Transmission Systems Project Implementation Duration Project Cost Reduction Inventory Optimisation Performance Measures - Tangible
Project Objective To inquire in to the state of readiness viz-a-viz conceptual requirements to propound an as-is stature, on transfer to an e-working environment
Project Questions Where we are ? Where to go ? How to go?
Methodology / Model • Process • Simplify the work • Study the Key Processes / sub processes • Explore possible alternative practices • Process to be adopted • Championing • Form cross functional Core Team • Decide on CSF • Decide on core Team Characteristics • Reduction in Maintenance Cost from X to Y • Better Inventory Control • Improve Productivity • Corporate Image • Security
Methodology / Model • Process • Simplify the work • Study the Key Processes / sub processes • Explore possible alternative practices • Process to be adopted • Championing • Form cross functional Core Team • Decide on CSF • Decide on core Team Characteristics • Functional Experts with IT as umbrella facilitator • Core Team Leader – Director / ED with Business Process Knowledge and Acceptable Image
Methodology / Model • Technology • Assess existing IT infrastructure • Assess IT Utilisation • Identify weak links • Security Architecture
Methodology / Model • People • Improve Information Culture • Inculcate sense of ownership • Acceptance to migration to IT enabled system • Approach - EEE
Methodology / Model ENLIGHTENING TRANSPARENCY CONFIDENCE ERP ENCOURAGING EMPOWERING TRUST
3Ms – EasilyManageable Money Machine Material STABLE, CERTAIN
4th M – the decisive Money Men Machine Material
Example EEE Show Case Example Inspection Management Process IMS
Earlier Process Sequential CC INSP DEPT Allocation REG INSP DEPTs Reporting Clearence Instructions Insp. Requests Plan & Reporting Insp. Requests VENDORS INSP ENGRs Inspection Scheduling & Inspection
Information Model of Inspection Process Inspection Engineers Inspection Office Administrator CC Administrator Inspection Management System IMS Guests Vendors Top Management Site Personnel
Case Outcomes • Highly efficient monitoring • Reduction in Process time – from over 2 weeks to 3 days on average • Increased Transparency and confidence • Convenience • Cost Reduction • Office processes • Travel • Duplications • Information based work culture
Acknowledgement Thanks, you favored us to be before you… Thanks, Dr Jaiswal for throttling us to make this. Thanks, Dr. Saxena, for all those nice insights given to us. Thanks, dear fellow officers for such a nice collaboration and encouragement POWERGRID
take care… … we are emerging, we have to.