620 likes | 836 Views
Ganda ERP System Cost Calculation Training for Dual Line and Dual Currency. Digiwin Group Ted Su 13-June-2014. CFC ERP Production Flow. Packing csrt305. Packing Merge (Manual). Quarry Explosive c srt301ab. Quarry Crush csrt301ab. Raw Mill csrt302. Klin csrt303. Cement Mill
E N D
Ganda ERP SystemCost Calculation Training for Dual Line and Dual Currency • Digiwin Group • Ted Su • 13-June-2014
CFC ERP Production Flow Packing csrt305 Packing Merge (Manual) Quarry Explosive csrt301ab Quarry Crush csrt301ab Raw Mill csrt302 Klin csrt303 Cement Mill csrt304 WS-Q-LST (P1000) 1500-000002 WS-PK-1 (P3110) 1505-000002 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-1 (P2110) 1502-000001 WS-KL-1 (P2210) 1503-000001 WS-CM-1 (P2310) 1504-000001 WS-Q-CLAY (P1000) 1501-000001 < Work Center > Product Line 1 < Cost Center > < Stock-in Item Code > WS-Q-LST (P1000) 1500-000002 WS-PK-2 (P3120) 1505-000003 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-2 (P2120) 1502-000002 WS-KL-2 (P2220) 1503-000002 WS-CM-2 (P2320) 1504-000002 WS-Q-CLAY (P1000) 1501-000001 Product Line 2
Packing Merge Procedure asri010 (Packing Merge M/C Setting) asri120 (Packing Merge Prd. Schedule) Purpose of PackingMerge PCB30 1505-000002 (P3-50kg-K) WIP By TK1 asri210 (Packing Merge Material Issue) Packing Merge Process PCB30 1506-000002 (P3-50kg-K) FG PCB30 1505-000003 (P3-50kg-K) WIP By TK2 asrt300 (Packing Merge Daily Report) To convert different Production Line Packing Cement Item No into FG Item No for sales. asrt320 (Packing Merge Stock-in)
Asri210 – Packing Merging Material Issue (Issue Line1 and Line2 WIP packed cement)
Production Cost Collection WS-Q-LST (P1000) 1500-000002 WS-PK-1 (P3110) 1505-000002 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-1 (P2110) 1502-000001 WS-KL-1 (P2210) 1503-000001 WS-CM-1 (P2310) 1504-000001 Product Line 1 WS-Q-CLAY (P1000) 1501-000001 G/L Labor & Overhead Account Indirect AccDept P3110 G/L Labor & Overhead Account 622111 - DL:Salary 622111 - DL:Salary 622111 - DL:Salary Mult-Dept Alloctaion Cost Center P3110 Direct AccDept P3110 627230 - OH:Supplies 627230 - OH:Supplies 627230 - OH:Supplies 627250 - OH:MaintExp 627250 - OH:MaintExp 627250 - OH:MaintExp ….. ….. ….. Packing Work Center WS-PK-1 6xxxxxx - OH : Dir. Exp 6xxxxxx - OH : Dir. Exp 6xxxxxx - OH : Dir. Exp Indirect AccDept P3110 Packer PM-01 Packer PM-02 Packer PM-03 Packer PM-04 Packer PM-06 Packer PM-06
Cost Calculation Setting Procedure axci001 (Multi-Dept Allocation for Labor) axci002 (Multi-Dept Allocation for OH) axci030 (Cost Article Setting) Cost Center (ex. P3110) Cost Center Level axci040 (Cost Center Data Collection) axci050 (Cost article allocate coefficient ) Direct Labor 1 OH Exp 1 OH Exp 2 Cost Article Level Dept CoA Dept CoA Dept CoA Dept. Account Level Axci060 (Cost Article by Product)
Monthly End Cost Calculation Procedure axcp720 (Production Volume Summary) All Transactions have been Input (Both VND/USD DB) axcp312 (G/L balance Allocation) (Both VND/USD DB) aimp620 (Monthly Inventory Calculation) axcr360 (Cross-Checking Before costing) (Only in VND DB) axcr370 (Cross-Checking After costing) axcp500 (Monthly Cost Calculation) (Both VND/USD DB) Cost Report Review & Checking (Both VND/USD DB)
Axcp720 – Production Volume Summary Run in Both VND DB(TKP1) and USD DB(TKP2)
Axcp312 – Auto allocation generation from G/L balance Run in Both VND DB(TKP1) and USD DB(TKP2)
Aimp620 -Inventory Calculation Monthly Only Need to Run in Both VND DB(TKP1).
Axcp500 – Cost Calculation Run in Both VND DB(TKP1) and USD DB(TKP2)
Cost Related Report • axcr999 : Cost Summary Report • axcr700 : Purchase Stored-in Monthly Rpt. • axcr430 : Inventory Cost Periodic Report • axcr760 : Sales Cost Monthly Report • axcr770 : MISC Transaction Monthly Rpt. • axcr771 : Production Material Issuing Monthly Rpt. • axcr772 : Production Stock-in Monthly Rpt. • axcr773 : Production Summary Report