1 / 62

Ganda ERP System Cost Calculation Training for Dual Line and Dual Currency

Ganda ERP System Cost Calculation Training for Dual Line and Dual Currency. Digiwin Group Ted Su 13-June-2014. CFC ERP Production Flow. Packing csrt305. Packing Merge (Manual). Quarry Explosive c srt301ab. Quarry Crush csrt301ab. Raw Mill csrt302. Klin csrt303. Cement Mill

bess
Download Presentation

Ganda ERP System Cost Calculation Training for Dual Line and Dual Currency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ganda ERP SystemCost Calculation Training for Dual Line and Dual Currency • Digiwin Group • Ted Su • 13-June-2014

  2. CFC ERP Production Flow Packing csrt305 Packing Merge (Manual) Quarry Explosive csrt301ab Quarry Crush csrt301ab Raw Mill csrt302 Klin csrt303 Cement Mill csrt304 WS-Q-LST (P1000) 1500-000002 WS-PK-1 (P3110) 1505-000002 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-1 (P2110) 1502-000001 WS-KL-1 (P2210) 1503-000001 WS-CM-1 (P2310) 1504-000001 WS-Q-CLAY (P1000) 1501-000001 < Work Center > Product Line 1 < Cost Center > < Stock-in Item Code > WS-Q-LST (P1000) 1500-000002 WS-PK-2 (P3120) 1505-000003 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-2 (P2120) 1502-000002 WS-KL-2 (P2220) 1503-000002 WS-CM-2 (P2320) 1504-000002 WS-Q-CLAY (P1000) 1501-000001 Product Line 2

  3. Csrt301a - Quarry process (Explosive for Limestone)

  4. Csrt301a - Quarry process (Crush for Limestone)

  5. Csrt301b - Quarry process (Crush for Clay)

  6. Csrt302 – Raw Mill (Line 1)

  7. Csrt302 – Raw Mill (Line 2)

  8. Csrt303 – Klin (Line 1)

  9. Csrt303 – Klin (Line 2)

  10. Csrt304 – Cement Mill (Line 1)

  11. Csrt304 – Cement Mill (Line 2)

  12. Csrt305 – Packing (Line 1)

  13. Csrt305 – Packing (Line 2)

  14. Packing Merge Procedure asri010 (Packing Merge M/C Setting) asri120 (Packing Merge Prd. Schedule) Purpose of PackingMerge PCB30 1505-000002 (P3-50kg-K) WIP By TK1 asri210 (Packing Merge Material Issue) Packing Merge Process PCB30 1506-000002 (P3-50kg-K) FG PCB30 1505-000003 (P3-50kg-K) WIP By TK2 asrt300 (Packing Merge Daily Report) To convert different Production Line Packing Cement Item No into FG Item No for sales. asrt320 (Packing Merge Stock-in)

  15. Asri010 – Packing Merge Machine Setting

  16. Asri020 – Packing Merging Production Schedule

  17. Asri210 – Packing Merging Material Issue (Issue Line1 and Line2 WIP packed cement)

  18. Asrt300 – Packing Merge Daily Report

  19. Asrt320 – Packing Merge Stock-in

  20. Production Cost Collection WS-Q-LST (P1000) 1500-000002 WS-PK-1 (P3110) 1505-000002 WS-PK (P3010) 1506-000002 WS-Q-LST (P1000) 1500-000001 WS-RM-1 (P2110) 1502-000001 WS-KL-1 (P2210) 1503-000001 WS-CM-1 (P2310) 1504-000001 Product Line 1 WS-Q-CLAY (P1000) 1501-000001 G/L Labor & Overhead Account Indirect AccDept P3110 G/L Labor & Overhead Account 622111 - DL:Salary 622111 - DL:Salary 622111 - DL:Salary Mult-Dept Alloctaion Cost Center P3110 Direct AccDept P3110 627230 - OH:Supplies 627230 - OH:Supplies 627230 - OH:Supplies 627250 - OH:MaintExp 627250 - OH:MaintExp 627250 - OH:MaintExp ….. ….. ….. Packing Work Center WS-PK-1 6xxxxxx - OH : Dir. Exp 6xxxxxx - OH : Dir. Exp 6xxxxxx - OH : Dir. Exp Indirect AccDept P3110 Packer PM-01 Packer PM-02 Packer PM-03 Packer PM-04 Packer PM-06 Packer PM-06

  21. CFC Dual Currency DB Structure

  22. Cost Calculation Setting Procedure axci001 (Multi-Dept Allocation for Labor) axci002 (Multi-Dept Allocation for OH) axci030 (Cost Article Setting) Cost Center (ex. P3110) Cost Center Level axci040 (Cost Center Data Collection) axci050 (Cost article allocate coefficient ) Direct Labor 1 OH Exp 1 OH Exp 2 Cost Article Level Dept CoA Dept CoA Dept CoA Dept. Account Level Axci060 (Cost Article by Product)

  23. Axci001 - Multiple department allocation setting for DL

  24. Axci002 - Multiple department allocation setting for OH

  25. Axci030 - setting cost article

  26. Axci040 - setting cost center data allocation

  27. Axci050 - Allocation coefficient

  28. Axci060 - Product Class Code Vs Cost Article setting

  29. Monthly End Cost Calculation Procedure axcp720 (Production Volume Summary) All Transactions have been Input (Both VND/USD DB) axcp312 (G/L balance Allocation) (Both VND/USD DB) aimp620 (Monthly Inventory Calculation) axcr360 (Cross-Checking Before costing) (Only in VND DB) axcr370 (Cross-Checking After costing) axcp500 (Monthly Cost Calculation) (Both VND/USD DB) Cost Report Review & Checking (Both VND/USD DB)

  30. Axcp720 – Production Volume Summary Run in Both VND DB(TKP1) and USD DB(TKP2)

  31. Axcp312 – Auto allocation generation from G/L balance Run in Both VND DB(TKP1) and USD DB(TKP2)

  32. Axcp312 – Auto allocation generation from G/L balance (VND)

  33. Axcp312 – Auto allocation generation from G/L balance (USD)

  34. Axct310 – Monthly Labor and Overhead (Allocation Result)

  35. Aimp620 -Inventory Calculation Monthly Only Need to Run in Both VND DB(TKP1).

  36. Axcr360 - Cross-CheckingBefore costing (VND)

  37. Axcr360 - Cross-CheckingBefore costing (USD)

  38. Axcp500 – Cost Calculation Run in Both VND DB(TKP1) and USD DB(TKP2)

  39. Axcr370 - Cross-CheckingAfter costing (VND)

  40. Axcr370 - Cross-CheckingAfter costing (USD)

  41. Cost Related Report • axcr999 : Cost Summary Report • axcr700 : Purchase Stored-in Monthly Rpt. • axcr430 : Inventory Cost Periodic Report • axcr760 : Sales Cost Monthly Report • axcr770 : MISC Transaction Monthly Rpt. • axcr771 : Production Material Issuing Monthly Rpt. • axcr772 : Production Stock-in Monthly Rpt. • axcr773 : Production Summary Report

  42. Acxr999 – Cost Summary Report (VND)

  43. Acxr999 – Cost Summary Report (USD)

  44. Acxr700 – Purchase Stored-in Monthly Rpt (VND)

  45. Acxr700 – Purchase Stored-in Monthly Rpt (USD)

  46. Acxr430 – Inventory Cost Periodic Report (VND)

  47. Acxr430 – Inventory Cost Periodic Report (USD)

  48. Acxr760 – Sales Cost Monthly Report (VND)

  49. Acxr760 – Sales Cost Monthly Report (USD)

  50. Acxr770 – MISC Transaction Monthly Rpt. (VND)

More Related