Deep Underground Science and Engineering Laboratory at Homestake

Deep Underground Science and Engineering Laboratory at Homestake. Facility Planning for DUSEL. Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008. Plans for Preliminary Geotechnical Studies. Scale: ~1 km (3000 ft.). 4850 Level (+118) Conceptual Layout. Yates Shaft.

Download Presentation

Deep Underground Science and Engineering Laboratory at Homestake

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deep Underground Science and Engineering Laboratory at Homestake Facility Planning for DUSEL Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Plans for Preliminary Geotechnical Studies

  2. Scale: ~1 km (3000 ft.) 4850 Level (+118) Conceptual Layout Yates Shaft Davis Cavern Existing Drifts Lab Modules Neutrino Detectors New Drifts Ross Shaft

  3. Preliminary Feasibility Studies have been done for Excavation and Ground Support for Typical Lab Modules Lab Module Ramped Excavation Sequence Preliminary Geotechnical Analyses were done to support the site selection and identify preliminary requirements for excavation and ground support requirements. Detailed site investigation studies will evaluate specific conditions at proposed locations for development. 4850 Level Map CDR

  4. Geotechnical Studies at Homestake • Homestake DUSEL Geotechnical Advisory Committee • Ziggy Hladysz, SDSMT ( Chair ) • Chris Laughton, FNAL • Bill Roggenthen, SDSMT • Bill Pariseau, Univ. of Utah • Steve Glaser, U.C. Berkeley • Herb Wang, Univ. of Wisconsin • Joe Wang, LBNL

  5. Request for Proposals for Geotechnical Engineering Services • Proposal are DUE June 20, 2008 • Anticipated Start Date for Underground Work ~ Sept. 2008 • Objectives for Preliminary Design of Lab Modules at 4850 Level and 300 Level • 1) to provide a better understanding of the rock properties • to characterize the rock conditions in the areas of proposed future development • to establish parameters and recommendations for the rock excavation design work to follow in the next phase of work for DUSEL • to provide geotechnical data that can be used to evaluate potential impacts that phased construction will have on the adjacent rock. • Scope of Work to be undertaken at the 4850 Level • Core Drilling • Laboratory Tests • In-Situ Tests • Site Mapping

  6. 4850 Level - Existing Infrastructure

  7. 4850 LevelGeology

  8. 4850 LevelDrilling Plan