1 / 21

Site Report Korean IPS system at KSWC 2013. 11. 23. Jung-Hoon Kim & Jincheol No (SETsystem, Inc.)

Site Report Korean IPS system at KSWC 2013. 11. 23. Jung-Hoon Kim & Jincheol No (SETsystem, Inc.). IPS SYSTEM. Korean IPS array is deployed at KSWC in Jeju Island, Korea. Korean IPS Array. Crossed-dipole Antenna. Tile (24 dipoles with reflecting mesh). Node (4 tiles makes 1 node).

billie
Download Presentation

Site Report Korean IPS system at KSWC 2013. 11. 23. Jung-Hoon Kim & Jincheol No (SETsystem, Inc.)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Site ReportKorean IPS system at KSWC2013. 11. 23.Jung-Hoon Kim & Jincheol No (SETsystem, Inc.)

  2. IPS SYSTEM

  3. Korean IPS array is deployed at KSWC in Jeju Island, Korea

  4. Korean IPS Array Crossed-dipole Antenna Tile (24 dipoles with reflecting mesh) Node (4 tiles makes 1 node) Whole system

  5. System Specification • 32 tiles deployed over 250 x 250 m2 (1tile=24 dipole antennas) • Frequency range : 327 MHz • Instantaneous bandwidth : 10 MHz • Continuum and spectrum modes • Dual polarization • Field of view : ~(1 rad)2 or (10 deg.)2 depending on observation mode • Beam size (angular resolution) : ~15’ • Effective collecting area : ~ 700 m2 • Receiver temperature : ~100 K • Point source sensitivity : 10 mJy @ 100 seconds integration • Time resolution : 1ms or less • Observing modes • Phased array mode for solar wind monitoring • Interferometer mode for radio sky imaging • Both modes for variable objects

  6. Tile (Antenna + Reflector) Reflecting plane can be rotated along N-S direction to increase the sky coverage

  7. System Diagram Control/ Processing Tile Antenna Node

  8. Staffs for Model run • Total 8 staffs working for ENLIL and IPS model run (4 operators designated to model running and forecasting) ENLIL and IPS model run / forecast Forecasting Division Model Operator Lee, J.H. Kwon, H.J. Park, S.R. Yun, J.H.

  9. IPS MODEL

  10. History

  11. IPSinternational collaboration • International collaboration with IPS model (UCSD) and observational data US IPS model • IPSdata • Solar wind/CME research • MOU (2012.08) • Model implementation India (Ooty) Korea (KSWC) • Data and researchcollaboration • Model and Data • MOU (2012.12) • Data and research collaboration Mexico (MEXART) Japan (STELAB)

  12. KSWC IPSSystem layout - Use ACE solar wind data, IPS observation, NSO magnetogram for model run -IPS Observational data are from Japan, Korea, India and Mexico KSWC IPS model Basic Data Web Scripts for data acquisition ACE Level 0 (NOAA FTP) Data dir. IPS Data (KSWC, Nagoya,) IPSmodel run Web visualization Image generation IDL,Fortran NSO 자기장 데이터 Output image * From UCSD ftp

  13. H/W specification

  14. S/W configuration

  15. KSWC IPS model output • Run the IPS model everyday at 02:00 UT (11:00 KST) Enlarge with animation

  16. RECENT WORKS WITH MODELS

  17. IPS model • Model run test with hybrid data (Nagoya + KSWC) • StandardIPS input data format for model run (Japan, Korea) STELAB data STELAB + KSWC data KSWC format 20130513065700 0 58.01139 126.295639 1.10979962484 0.0 0.0 0.0 1.01039958 338.3592562 338.3592562 --- 0.0 8.0 20130513 18.3945441966 0.0 ---- 13.5 -0.04178885858 -0.0422301012404 2251p16 5.11589532755 5.11630763006 1 20130513073934 IPS_JEJU -24.951171875 512 58.8 20130513065700 512 24.853515625 Japan STELAB format 1759+13 130102 2.09 0.61 50 16 45 334 2132 -999-999 1.05766 17 59 22 +13 51 17 18 01 39 +13 51 19 1819-096 130102 2.44 0.25 65 53 58 7 2131 -999-999 1.33069 18 19 44 -09 40 29 18 22 29 -09 38 57 Make a standard format from each IPS telescope and use as model input

  18. Compare the result of ENLIL & IPS • Synchronize the model output results and compare two models • 7 days (-2/+5) prediction results, 6 hours cadence

  19. Comparison results of ENLIL, IPS, ACE • Color lines represent that only one model predicts the CME • This results shows that each models have their own advantage : ENLELonly case, : IPSonly case

  20. Summary • KSWC have been operating two solar wind prediction models from 2013

  21. Summary • Korean IPS system • For operational purpose • Owned by KSWC which is government agency • Maintained by SETsystem, Inc. which is system developer and contractor for operation • To do • Data quality check, single site obs. use model fitting technique • Combine of the ENLIL and IPS model

More Related