GTC Commissioning (as of September 2008). Peter Hammersley (GTC). Summary. Introduction to the observatory June 07 – July 07 First light July 07 – March 08 March 08 - July 08 More observations July 08- October 08

bisa
Download Presentation

GTC Commissioning (as of September 2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTC Commissioning (as of September 2008) Peter Hammersley (GTC)

  2. Summary Introduction to the observatory June 07 – July 07 First light July 07 – March 08 March 08 - July 08 More observations July 08- October 08 October 08 – March 09 Preparing for Day 1

  3. The GTC complex Main Building Annex Building Auxiliary building

  4. Fish eye view

  5. Lateral View of SegmentEach segment size 1.8m weight 500 kg M1

  6. M2

  7. Acquisition and Guide system I

  8. A&G system II Arm 1 ASGC - camera FoV 60” SFS - high resolution wavefront sensor Arm 2 FGC/STS Field of view 12” Up to 150 frames per second

  9. First light Strict deadline (13th July 2007) 12 Segments No tracking ASGC

  10. First light II

  11. First light III

  12. July 07 – March 08 Making the tracking operational and safe 24 Segments Improve reliability

  13. March 08 – July 08. Optics • Stacking • M1 M2 alignment • OLAcO tested • Best FWHM • Segment 0.4” • Stacked 0.6”

  14. Images courtesy of the FASTCAM team March – July 08. Fastcam Objects separated by 0”.196 & 0”.906 sources separated by 1.1” - Individual segments - All segments combined

  15. March – July 08. Pointing tracking • Pointing with 0.9” accuracy • Tracking error: 0.25” in 10 min • Meets Day 1 spec !!

  16. March 08 – July 08. High speed tracking

  17. March – July 08. A&G test • Photometric characterization (zero-points,…) • Ghosts and stray light analyses • Fast modes and windowing capabilities • etc…

  18. March – July 08. Pretty Pictures IC4381 Einstein cross

  19. March – July 08. Pretty Pictures II NGC6027 UGC 10043

  20. March – July 08. Pretty Pictures III He2_428 K4_3

  21. March – July 08. Pretty Pictures IV

  22. July 08 –October 08 No Observations 36 Segments Instrument rotators operational Secondary recoated

  23. October 08 – March 09 • Work with the instrument rotator • Work with A&G arms off axis • Start guiding • Wavefront sensing • Commissioning first science instrument

  24. March 09 About 50 % science 50% commissioning Only offering OSIRIS Broad Band Imaging TF Imaging Long slit spectroscopy Minimum proposal time 10 hours.

  25. Conclusions Image quality currently limited to 0.6” Will improve when WFS operational Pointing and tracking meet specifications Next tasks Field de-rotation Guiding First science instrument