Design and Implementation of Title 5 Systems and Small Package Treatment Plants

Design and Implementation of Title 5 Systems and Small Package Treatment Plants . Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts Road, Plymouth, MA 02360 508-747-7900 extension 117 jmcallister@norfolkram.com. Wastewater Happens

blaise
Download Presentation

Design and Implementation of Title 5 Systems and Small Package Treatment Plants

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts Road, Plymouth, MA 02360 508-747-7900 extension 117 jmcallister@norfolkram.com

  2. Wastewater Happens How We Deal with it is very important!

  3. Health Impacts Associated with Wastewater • Can carry/cause Disease • Nitrates harmful effects on infants • Drinking water contamination • Coastal Impacts • Plant Growth • Algae Blooms • Fish Kills • Shellfish Bed Closures

  4. Residential Areas without a Centralized Wastewater System • Regulated by 310 CMR 15.00 Title 5 On-Site Subsurface Disposal Systems

  5. Residential Areas without a Centralized Wastewater System • Inspections Required for Sale of Home Periodic for Large Systems and Condominiums • Must Inspect Tank Distribution Box Leaching System (if accessible) • Failure – Conditions • Validity of Inspection

  6. Title 5 System Design Planning • Soil Evaluation • Percolation Test

  7. Title 5 System Design Planning Design Plans

  8. Title 5 System Implementation Trenches

  9. Title 5 System Implementation Galleys

  10. Title 5 System Implementation Plastic Chambers

  11. Title 5 System Implementation Innovative/ Alternative Technology Nitrogen Sensitive Areas High Groundwater Site Constraints

  12. Title 5 System Implementation Operations & Maintenance • Pumping Bi-Annually • Removing Garbage Grinders • Avoid Dumping Bleach, Paint, and Solvents into System • I/A Systems have specific maintenance considerations • Some BOH’s require O&M documentation and/or testing for I/A Systems

  13. Large Systems – Greater Than 10,000 gpd Regulated by DEP – Groundwater Discharge Permit • Nutrient Loading Approach • Effluent Discharge Standards • Water Reuse Standards • 30/30/10 Standard

  14. Large Systems – Greater Than 10,000 gpd Rotating Biological Contactor – RBC Treatment Plant • Residential Apartment Complexes • Commercial Buildings

  15. Large Systems – Greater Than 10,000 gpd RBC Treatment Plant • Residential Apartment Complexes • Commercial Buildings

  16. Large Systems – Greater Than 10,000 gpd RBC Treatment Plant Control Panel Pumps Filters Blowers All Automated

  17. Large Systems – Greater Than 10,000 gpd Membrane Treatment Plant • Different Sized Membranes • Microfiltration- Ultrafiltration

  18. Large Systems – Greater Than 10,000 gpd SBR Treatment Plant • The Classic Treatment Plant • Most Municipal Facilities

  19. Treatment Options and Effluent Characteristics

  20. Design and Implementation of Title 5 Systems and Small Package Treatment Plants QUESTIONS? jmcallister@norfolkram.com