An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSB ISOLDE specific aspects PS-Booster Operation for ISOLDE

  2. PS-Booster operation for ISOLDE • Machine layout • Different Beams • Beam Steering • Focusing • ISOLDE Security Chain • Summary E. Siesling AB/OP

  3. PS Complex layout E. Siesling AB/OP

  4. PSB layout E. Siesling AB/OP

  5. ISOLDE layout E. Siesling AB/OP

  6. Different Beams • ISOHRS • ISOGPS • STAGISO: Staggered beam E. Siesling AB/OP

  7. ISOHRS • Beam to the HRS target (High Resolution Separator) • High intensity proton beam up to 3E13ppp (protons per pulse) at an energy of 1,4GeV/c • Occasionally 1GeV/c • Typical target types: Uranium-Carbide-powder, Tantalum-foil, Niobium-foil, etc. E. Siesling AB/OP

  8. ISOHRS timing & extraction • ISOHRS cycle: basic period 1,2 seconds • PSB in h=1 mode, 1 bunch per ring, distance between bunches 572ns (157m) • Extraction: 4 equidistant bunches: Ring 3, 4, 2, 1. Bunch-length 250ns E. Siesling AB/OP

  9. ISOHRS extraction ejection in the order3-4-2-1 4 3 t0 to ISOLDE 2 1 4 from 3 from 4 3 t1 2 1 from 2 K. Hanke from 1 E. Siesling AB/OP

  10. ISOHRS extraction to ISOLDE t1 4 equidistant bunches Bunch-length 250ns t=572ns (157m) E. Siesling AB/OP

  11. BT4.BVT10 BT4.SMV10 BT4.KFA10 from R4 from R3 from R2 BT.KFA20 BT.SMV20 from R1 BT.BVT20 BT1.KFA10 BT1.SMV10 BT1.BVT10 septa kickers septum kicker dipole dipoles K. Hanke E. Siesling AB/OP

  12. ISOHRS line Fragmentation Spallation Fission E. Siesling AB/OP

  13. ISOGPS • Beam to the GPS target (General Purpose Separator) • High intensity proton beam up to 3E13ppp (protons per pulse) at an energy of 1,4GeV/c • Occasionally 1GeV/c • Typical target types: Uranium-Carbide-powder, Tantalum-foil, Niobium-foil, etc. E. Siesling AB/OP

  14. ISOGPS timing & extraction • ISOGPS cycle: basic period 1,2 seconds • PSB in h=1 mode, 1 bunch per ring, distance between bunches 572ns (157m) • Extraction: 4 equidistant bunches: Ring 3, 4, 2, 1. Bunch-length 250ns E. Siesling AB/OP

  15. ISOGPS line Fragmentation Spallation Fission E. Siesling AB/OP

  16. Staggered beam: STAGISO • Beam to the HRS or GPS target • Low intensity proton beam. Depending on target between 5E12 to 1E13ppp • Reduced shock at impact for more ‘sensitive’ liquid metal targets • Typical targets: Sensitive Liquid metal: Lead, Tin, etc. E. Siesling AB/OP

  17. STAGISO: timing & extraction • ‘Staggered’: bunches as far from each other as possible, 10us • Specific operation: 3 bunches instead of 4 • 3 consecutive bunches from ring 3, 4, 2bunch-length 150ns. Ring 1 is empty. Limitation: kicker BT.KFA20 pulses 2us max and needs 30ms to recharge E. Siesling AB/OP

  18. Limitation: kicker BT.KFA20 pulses 2us max and needs 30ms to re-charge.. BT4.BVT10 BT4.SMV10 BT4.KFA10 from R4 from R3 from R2 BT.KFA20 BT.SMV20 from R1 BT.BVT20 BT1.KFA10 BT1.SMV10 BT1.BVT10 septa kickers septum kicker dipole dipoles K. Hanke E. Siesling AB/OP

  19. STAGISO specific Op’s • STAGISO settings are loaded on top of a ISOHRS or ISOGPS and will only change the way of extraction at the booster • Use NAOS to measure and verify correct timing of bunch-length and time between bunches E. Siesling AB/OP

  20. STAGISO on ISOGPS Fragmentation Spallation Fission E. Siesling AB/OP

  21. PS-Booster operation for ISOLDE • Machine layout • Different Beams • Beam Steering • Focusing • ISOLDE Security Chain E. Siesling AB/OP

  22. Beam Steering and Focusing • END_LINE_ISOLDE workingset E. Siesling AB/OP

  23. Steering • BTY.DHZ211 and BTY.DVT212 for GPS proton beam steering • BTY.DHZ323 and BTY.DVT324 for HRS proton beam steering E. Siesling AB/OP

  24. Steering elements GPS steering HRS steering E. Siesling AB/OP

  25. Steering by ISOLDE operator • At each target-change:Proton Scan: Final steering of the proton beam will be done by the ISOLDE Operator E. Siesling AB/OP

  26. Steering Secundary nuclei 60kV accelerated p+ VERT HOR E. Siesling AB/OP

  27. PS-Booster operation for ISOLDE • Machine layout • Different Beams • Beam Steering • Focusing • ISOLDE Security Chain E. Siesling AB/OP

  28. Focusing Fragmentation, Spallation, Fission • Standard focus • Waist of beam at target(converter targets) Fragmentation, Spallation,Fission n n n n E. Siesling AB/OP

  29. p+ p+ p+ p+ p+ p+ Focusing: targets Target Target Converter Converter Target Standard E. Siesling AB/OP

  30. Focusing • BTY.QDE209 and BTY.QFO210 for GPS proton beam focusing • BTY.QDE321 and BTY.QFO322 for HRS proton beam focusing E. Siesling AB/OP

  31. Focusing elements GPS focus HRS focus E. Siesling AB/OP

  32. Focus settings E. Siesling AB/OP

  33. Wrong Focus Liquid metal target: Cracked container welds Converter target: Twisted W convertor rod E. Siesling AB/OP

  34. Semgrids • Current provoked by beam hitting the grid-wires: Secondary EMission • To measure displacement in the horizontal and vertical plane as well as shape of the beam e- p+ E. Siesling AB/OP

  35. Semgrid workingset • Fixed semgrids: Measure -> SMG Isolde GPS/HRS Line: GPS.MSF10 and HRS.MSF10 • Semgrid target:Measure -> SMG Isolde Target Rep.: BTY.MSG01 • Attn. make sure PLS is set correctly! E. Siesling AB/OP

  36. Semgrids GPS.MSF10 Semgrid target BTY.MSG01 HRS.MSF10 E. Siesling AB/OP

  37. Semgrids ‘Beam displacement’ Gaussian fit: I/Imax=e -(x-)²/2² 100% I/Imax=0.6 when (x-)=± 60% 84% 95% ‘Beam width’ ±=84% ±2=95%   +2 - + -2 E. Siesling AB/OP

  38. PS-Booster operation for ISOLDE • Machine layout • Different Beams • Beam Steering • Focusing • ISOLDE Security Chain E. Siesling AB/OP

  39. ISOLDE Security Chain Controlling: Door 901 (Target-Zone) Door 902 Separator Zone HRS Separator Zone GPS High Voltage Room + HV room E. Siesling AB/OP

  40. Door 901 Target zone Door 902 GPS Separator zone Shielding door High Voltage room HRS Separator zone GPS door HRS door E. Siesling AB/OP

  41. Target zone: Secure: -Zone closed, interlock keys in place (MCR), all access keys in place (door 901) Access: (behind shielding door: e.g. target change) -Security interlock tripped: BTY.BVT101 off and BTY.STP103 shut -Ventilation ok (1/2 hr after switching to access mode at ISOLDE) -Veto TIS off -Shield door can be moved -Access authorized persons under TIS supervision -> Access key + HV room E. Siesling AB/OP

  42. BTY.BVT101 & BTY.STP103 ISOLDE (BTY) booster E. Siesling AB/OP

  43. Separator zones: As of 2005: Considered as primary zones Secure: -Zone closed, interlock keys in place (MCR), access key in place (ICR) Access: -Security interlock tripped: BTY.BVT101 off and BTY.STP103 shut -Veto TIS off -Release Sep. zone access key in the ICR Primary zones + HV room E. Siesling AB/OP

  44. High Voltage room: (Secundary zone) Secure: -Zone closed, interlock keys in place (MCR), access key in place (ICR) Access: -Radiation monitor PAXY05 < 100uS/h Violating this rule will set off a radiation alarm in the MCR! + HV room E. Siesling AB/OP

  45. Summary • Different beams: ISOHRS, ISOGPS, STAGISO • Proton beam steering: END_LINE_ISOLDEProton scan for each target by the ISO-OP • Focusing: Standard, On Waist • Security Chain:ISOLDE target-zone is ‘hot’!Bender BTY.BVT101 and stopper BTY.STP103 E. Siesling AB/OP

  46. Thank you for your attention

More Related