ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014. Updates and FYIs. NPRR 570: Transition to posting Initials on OD + 6 has been smooth No issues to report from ERCOT NPRR 568: Project is on Track for June 1 delivery NPRR 591 introduced detailed settlements implementation
E N D
ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014
Updates and FYIs • NPRR 570: • Transition to posting Initials on OD + 6 has been smooth • No issues to report from ERCOT • NPRR 568: • Project is on Track for June 1 delivery • NPRR 591 introduced detailed settlements implementation • QSEs should use NPRR 591 when creating shadow settlements • New NPRR will be at the 2-13-2014 PRS meeting that introduces some additional minor changes • Removes STARTUP and SHUTDOWN status from PRC and ORDC calculations • Sets Real-Time Off-Line available reserves used in the ORDC calculation to zero when Real-Time On-Line available reserves minus Real-Time On-Line reserves available in 10 minutes becomes less than or equal to 2,300 MW which is the PRC MW at which EEA Level 1 is initiated • Training materials are in progress.