ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014

ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014. Updates and FYIs. NPRR 570: Transition to posting Initials on OD + 6 has been smooth No issues to report from ERCOT NPRR 568: Project is on Track for June 1 delivery NPRR 591 introduced detailed settlements implementation

boris-dean
Download Presentation

ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERCOT Updates Matthew Tozer ERCOT COPS 2/12/2014

  2. Updates and FYIs • NPRR 570: • Transition to posting Initials on OD + 6 has been smooth • No issues to report from ERCOT • NPRR 568: • Project is on Track for June 1 delivery • NPRR 591 introduced detailed settlements implementation • QSEs should use NPRR 591 when creating shadow settlements • New NPRR will be at the 2-13-2014 PRS meeting that introduces some additional minor changes • Removes STARTUP and SHUTDOWN status from PRC and ORDC calculations • Sets Real-Time Off-Line available reserves used in the ORDC calculation to zero when Real-Time On-Line available reserves minus Real-Time On-Line reserves available in 10 minutes becomes less than or equal to 2,300 MW which is the PRC MW at which EEA Level 1 is initiated • Training materials are in progress.

More Related