Time Meeting: Agenda

Time Meeting: Agenda. Safety Setup Status and Schedule RHIC and Experiments Reports Machine and Systems Reports AOB. Safety. Take 5 for Safety…………..Ed Lessard. Setup Schedule. Since we last met:. Dry Run 08 completed. New JET silicon detectors installed.

bracha
Download Presentation

Time Meeting: Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Meeting: Agenda • Safety • Setup Status and Schedule • RHIC and Experiments Reports • Machine and Systems Reports • AOB

  2. Safety • Take 5 for Safety…………..Ed Lessard

  3. Setup Schedule

  4. Since we last met: • Dry Run 08 completed. • New JET silicon detectors installed. • Booster Transformer Switch work for LIPA scheduled for 1 November 2007 7AM-7PM. • LHe delivery schedule set.

  5. RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • NSRL....................................Adam Rusek • BLIP…………………….…..Leonard Mausner • APEX......................................Fulvia Pilat

  6. Machine Reports • Operations……………...Peter Ingrassia • Sources...............................Jim Alessi • Linac and Tandem...............Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Beam Comp/Instrum..……..Tom Russo

  7. Systems Reports • Cryogenics.............Andy Warkentien • Vacuum..........................Mike Mapes • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF…………………………...Tom Throwe