Time Meeting: Agenda • Safety • Setup Status and Schedule • RHIC and Experiments Reports • Machine and Systems Reports • AOB
Safety • Take 5 for Safety…………..Ed Lessard
Since we last met: • Dry Run 08 completed. • New JET silicon detectors installed. • Booster Transformer Switch work for LIPA scheduled for 1 November 2007 7AM-7PM. • LHe delivery schedule set.
RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • NSRL....................................Adam Rusek • BLIP…………………….…..Leonard Mausner • APEX......................................Fulvia Pilat
Machine Reports • Operations……………...Peter Ingrassia • Sources...............................Jim Alessi • Linac and Tandem...............Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Beam Comp/Instrum..……..Tom Russo
Systems Reports • Cryogenics.............Andy Warkentien • Vacuum..........................Mike Mapes • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF…………………………...Tom Throwe