MOBILE MAPPING NOT JUST FOR ASSET MANAGEMENT OTEC CONFERENCE October 29, 2014. TIM VANGELDER, PLS REGIONAL GEOMATICS MANAGER. JASON NYBERG, PLS GEOMATICS PROJECT MANAGER. Presentation Outline:. Introductions National Standards & Specifications Vehicle & Equipment Overview

brady-logan
Download Presentation

MOBILE MAPPING NOT JUST FOR ASSET MANAGEMENT OTEC CONFERENCE October 29, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MOBILE MAPPINGNOT JUST FOR ASSET MANAGEMENTOTEC CONFERENCEOctober 29, 2014 TIM VANGELDER, PLS REGIONAL GEOMATICS MANAGER JASON NYBERG, PLS GEOMATICS PROJECT MANAGER

  2. Presentation Outline: • Introductions • National Standards & Specifications • Vehicle & Equipment Overview • Survey Grade Accuracies • MOT 75 Stanley Ave Bridge Project • Typical Workflow • Field Procedures • Office Processing Procedures • Office Mapping Procedures • Typical Applications for Mobile Scanning • Limitations of Mobile Scanning • Questions

  3. National Standards & Specifications: • Started Around 2007-2008 in USA • Equipment & Methodologies Continue to Improve • Transportation Research Board (TRB) Standards • http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_748.pdf • CALTRANS Standards • http://www.dot.ca.gov/newtech/new_dri_internet/3d_4d_files/caltrans_district_4_mtls_guidelines.pdf • FDOT Standards • http://www.dot.state.fl.us/surveyingandmapping/documentsandpubs/20131007_TML_Guidelines.pdf

  4. LiDAR Acquisition Methods Fixed Wing Rotary Wing Mobile Terrestrial Higher Lower Point Density

  5. Technology Application Speed and Range of Collection High Low Higher Lower Point Density

  6. MoDaCTM Mobile LiDAR • 2 GPS units and Inertial Measurement Unit (IMU) • Distance Measurement Instrument (DMI) • 4 Digital Cameras or Single 360 Ladybug Camera • 2 LiDAR Scanners • Combined 1 million points/sec • 360 degree field of view • Density 500-5000 Points/Meter LiDAR Sensors GPS Antenna IMU DMI

  7. FIELD PROCEDURES – DATA COLLECTION • Why Two Sensors? • Minimize laser shadowing • Optimize FOV • Sensor will see everything behind the vehicle • Sensor will see ~45º in front of vehicle • Full area coverage Sensor head 1 coverage Sensor head 2 coverage All sides covered

  8. Density & Spacing: Typical Collection Speeds 50Km/Hr – 100Km-Hr (30MPH – 60MPH)

  9. Data Processing • The point clouds and imagery contained million of measurements • Information required for client deliverables is extracted from the point clouds and imagery • Client Deliverables can be in almost any format Data Post Processing and Calibration (Software Varies by Sensor) Classification and Feature Extraction (Terrasolid, GeoCue, TopoDot, Virtual Geomatics, Cloudworks) GIS ESRI Smallworld Geomedia Industry Specific PLS_CADD Rail Track Clarion Dbase/Tabular Ascii Excel SQL Oracle CADD AutoCAD Microstation GEOPAK Caice

  10. MOBILE SCANNING SURVEY GRADE ACCURACIES • Survey Requirements • Dual GNSS Base Stations • Mobile Panel Spacing – Maximum 1500’ with 500’ check shots • Mobile Panel Horizontal Accuracy – Positional tolerance 0.07’ • Vertical Accuracy – Positional tolerance 0.02’ • Scanning Requirements • Dual Sensors (500kHz Laser Speed) • Dual GNSS GPS Antennas • Inertial Measurement Unit (IMU) • Distance Measurement Unit (DMI) • QUAD Cameras (5MP) • 60’ Cutoff from Sensors

  11. MOT 75 Project • I-75 from 500’ south of Leo St. to 500’ south of Neva St. and 550’ of Stanley Ave. including ramps & loops in Dayton, Ohio • Length: 8,800 LF • Schedule: 4 weeks

  12. Scope of Work • Mobile Scan Data Collection of LiDAR & Imagery • Drive each lane of I-75, Stanley Ave, ramps & loop • Process LiDAR & Imagery to project datums • Perform Calibration of data • Adjust data to ground truthing & check shots • Perform RMSE analysis of adjusted data • Process Georeferenced Imagery • Extract 3D DTM & 2D Planimetric data • Generate TIN & Contours • Deliver Scan Data, DTM, TIN, Planimetrics & Contours in Microstation V8i/Geopak format per ODOT Standards and Specifications

  13. Survey Control & Mobile Targets • Survey Control provided by ODOT • 39 Mobile Scan Targets and 15 check shots provided by ODOT • NAD 83/2011 and NAVD 88 Datums • Ohio State Plane South Zone • Double Occupation VRS-GPS collection for control • Hz < 0.03’, Z < 0.02’

  14. Sample of Drive Lines • Dual GNSS Base Stations observing data while performing data collection • Drive each lane with proper start/stop procedures to ensure complete coverage and redundancy

  15. Results & Deliverables 3D DTM & Contours • RMSE between surveyed mobile targets and scan data < 0.03’ • Final DTM surface < 0.07’ Deliverables • Calibrated LiDAR point cloud in LAS & POD formats • 3D DTM in Microstation V8i format • 2D Planimetrics in Microstation V8i format • TIN & DAT files in Geopak format • 1ft & 5ft contours • Georeferenced imagery & index file 2D Planimetrics

  16. Accuracy Analysis • Numerous studies from various state agencies, vendors and private companies • Nearly all DOT’s are using Mobile Scanning for design purposes • Transportation Research Board (TRB) embraces Mobile Scanning for design purposes TIN – TIN Comparison Mobile LiDAR vs Static Scanning Maximum error <0.07’

  17. MISSION PLANNING • PANEL PLAN • DRIVE LINES • SURVEY LIMITS • SCOPE OF WORK • TRAFFIC VOLUME

  18. MISSION PLANNING WHEN IS THE BEST TIME TO SCAN? TRIMBLE MISSION PLANNING ONLINE

  19. FIELD PROCEDURES – SURVEY PANEL CONTROL • Spacing – Maximum 1500’ • Horizontal Accuracy – Positional tolerance 0.07’ • Vertical Accuracy – Positional tolerance 0.02’ • Methodologies: • Horizontal – VRS Double Occupation (minimum) • Horizontal – Conventional Adjusted Traverse (Raw 1:20,000) • Vertical – Conventional or Digital Level Loop

  20. FIELD PROCEDURES – GROUND TRUTHING • NEW TARGETS- • SOFTWARE AUTO COLLECTS CONTROL POINTS IN LIDAR • EASIER TO PLACE • DURABLE

  21. PosPac GPS PROCESSING WHAT GOES IN: RAW GPS INFORMATION BASESTATION INFORMATION DMI INFORMATION IMU DATA • WHAT COMES OUT: • ACCURACY FILE • SBET-(SMOOTHED BEST ESTIMATE OF TRAJECTORY)

  22. CALIBRATING DATA FINAL CALIBRATED DATA RAW DATA

  23. Ground Truthing Adjustments & Tie Lines Adjustment to Mobile Target Coordinates Planer Adjustments to Coordinate Flight Lines

  24. LiDAR with Imagery - TopoDOT TopoDOT- 3D Image Data Processing Tool Suite

  25. TopoDOT- 3D Image Data Processing Tool Suite

  26. TopoDOT- 3D Image Data Processing Tool Suite

  27. Different Vehicle Platforms

  28. MoDaC Mobile LiDAR for Roadways • Engineering Topographic Surveys • As-built Surveys • Structure and Bridge Clearance Surveys • Corridor Study and Planning Surveys • Asset Inventory and Management • Deformation Surveys

  29. MoDaC Mobile LiDAR for Bridge Clearances TDOT Bridges Clearances – I-40 Nashville, TN

  30. MoDaC Mobile LiDAR for Rail • Engineering Design • Clearance Studies • ROW Asset Inventory • Rail Yards • Tunnels • Catenary Studies • PTC Mapping and Change Management • Track Alignments • Data can be output to industry standard design packages

  31. LIMITATIONS OF MOBILE SCANNING • Project Must be Drivable • Blockages & Shadowing • Weather • Standing Water • Vegetation • Length of Project Limits • Complexity of Project

  32. Questions?