Barrel Support Structure and Barrel Integration Preparations

Barrel Support Structure and Barrel Integration Preparations. Doug Benjamin Duke University HEP. Barrel Support Structure (BSS). Fabricated in Russia Components – A side and C side end Frames Inner cylinder Outer cylinder (in two halves). Duke’s Role in BSS assembly.

braima
Download Presentation

Barrel Support Structure and Barrel Integration Preparations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Barrel Support Structure and Barrel Integration Preparations Doug Benjamin Duke University HEP

  2. Barrel Support Structure (BSS) • Fabricated in Russia • Components – A side and C side end Frames • Inner cylinder • Outer cylinder (in two halves)

  3. Duke’s Role in BSS assembly • Integral part of small team (6 people – Jack Fowler and DB) • Jack Fowler – one of two engineers • DB – physicist responsible • Verify the BSS assembly Frame • Develop and verify BSS assembly • JF designed inner cylinder flange.

  4. Duke’s Role in BSS assembly (Cont.) • Measure individual BSS components • Analyze the measurement results

  5. Duke’s Role in BSS assembly (Cont.) • Shield the BSS components • Assemble the BSS • Verify the BSS alignment results

  6. Preparations for integration • DB was physicist reponsible for integration • Developed the procedures to be used during integration • Verified the procedures • DB and JF produced a lengthy list of items to be finished before integration. • This list was adopted by an internal review committee on barrel integration readiness

  7. Preparations for integration (cont.) • Prepared the infrastructure require for integration (scolding, gas lines, HV lines, HV software, module protection) • Prepared the modules for integration (Capacitor insertion) • First module permanently installed June 2004 • DB passes responsibility for Barrel integration to Chiho Wang during June 2004 DB could not travel as much (~ 60% of time at CERN) for family reasons.

  8. Conclusions • Duke played a vital role in the BSS assembly • Without efforts of JF and DB BSS assembly and verification would have not happened in a timely manner. • DB and JF made crucial and significant contributions to preparations for the start of integration. This required that both spend large amounts of time at CERN for the past year (> 6 months each). • Excellent preparation for integration has meant that integration has gone smoothly (see Chiho’s talk).