An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The archive solution from Vision solutions that has helped Hagemeyer in the last 12 months gain control over data growth.” 15th November 2005 Stuart Bates Project Manager

  2. Project History • Standard Movex Archiving functionality exists but does not allow view or restore of the archived data • Extensive testing of standard archiving programmes revealed lengthy run times unlikely to be accommodated by the overnight batch window. • Concluded by Project Manager that Standard programmes not fit for business in December 2003.

  3. Business Case • Originally projected that by 10th September 2004, DASD would reach 85% utilisation resulting in service degradation. • Not possible to continue adding DASD due to negative impact upon AS400 Processor. • System response deteriorating in many inquiry programmes due to volume of data. • Development required to provide users with view of archived data both on-line and off-line • Reduce size of Live Movex to enable copy for QA

  4. Developments • Modification N3046 written by Intentia to create an On-line Movex Archive Environment, accessible as a function from Standard Movex • Modification N3047 written to deliver restricted view capability within the environment • OS Data Manager from Vision Solutions installed in QA and LIVE to extract the required records for Archiving documented in MOD240 (Business Requirements Document).

  5. Why OS Data Manager from Vision Solutions ? • OSD Relationship with Intentia – Assurance that products are compatible and development continues independent of Hagemeyer. • Data Manager allows HUKL to purge/archive data from within Movex files, abiding by the rules specified WHILST USERS ARE STILL ONLINE • Archive Models can be built easily given the appropriate Movex file structure knowledge. New models also regularly developed by Vision • Audit trail/detailed history of Archive jobs retained

  6. Data Manager

  7. Data Manager

  8. Architecture

  9. Customer Orders Model

  10. Achievements • Single Step Archives (Purges to MVXBARC999) using Data Manager 5.1 • CINACC (Internal Accounting Entries) Agreement secured from FD’s – Records dated <20030101 successfully Archived removed 25Gb of total file size 100 GB • OSBSTD/STZ - Sales statistics <20030101 archivedrolling 24 months in Live retained. Division 901duplicate also archived. 50 Gb from total size107 Gb • PM400 – IBM performance statistics identified by Technical Team using the data manager and 500 Gb purged from the AS400. Resulted in 49% DASD utilisation figure – the lowest since go – live. Utilisation at 16/05/05 is 56%

  11. Achievements • Batch Orders (OXHEAD) • OINVIP/ZHVIIP – Invoices in Progress } • OTRSMS (Sales/Marketing System) } 74 Gb recovered • 2 Step Models Developed • Customer Orders • Customer Invoices • Requisition/Distribution Orders • Purchase Orders • Movex On-line Archive Environment Delivered – 12th November 2005.

  12. Movex On-Line Archive

  13. Phase 1 Archive Jobs in progress Jobs now being run on Data Manager 6.1 • Internal Accounting Entries (Cinacc) run 2 >20040101 • Order Entry Statistics (OSBSTD) >20050101 • Customer Orders • Customer Invoices • Inventory Movement Orders

  14. Phase 2 planned Jan 2006 FAM Archiving (available in Data Manager 6.2) • Accounts receivable • Accounts payable • General Ledger

  15. Phase 1 Estimated Savings/Benefits • 371Gb (approx 10%) of Total DASD storage capacity • Huge reduction in Movex file numbers to enhance performance. E.g OOLINE from 121,664 records to 85,165 • Enable copy of Live to produce new QA environment by end QTR 1 • If all goes to plan……………..