1 / 17

JEM-X Status S. Brandt on behalf of the JEM-X team

JEM-X Status S. Brandt on behalf of the JEM-X team. Partly based on a presentation at ESOC, Feb 2005 at review marking the end of the nominal INTEGRAL mission ESAC, March 14, 2005. Hardware performance (no news). Electronics The performance of the JEM-X electronics has been nominal

Download Presentation

JEM-X Status S. Brandt on behalf of the JEM-X team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JEM-X StatusS. Brandt on behalf of the JEM-X team Partly based on a presentation at ESOC, Feb 2005 at review marking the end of the nominal INTEGRAL mission ESAC, March 14, 2005

  2. Hardware performance(no news) • Electronics • The performance of the JEM-X electronics has been nominal • No resets of DFEE CPU • No ageing of FPGA • Unchanged performance of amplifiers • Mechanical • No gas leak of Be window • No detectable contamination of the Xe gas • Detector collimator geometrical details are harder to model than expected. Vignetting function at large off-axis angles has some uncertainties. SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 2

  3. Software performance • DFEE software • Performance has been nominal • Software patches have been introduced to tune detector performance and increase event processing speed(no new ones recently) • DPE software • Performance of IASW and CSSW have been nominal • One SW patch to correct broadcast packet interpretation • SW patch to raise class of OEM 191 is pending • One reset of CSSW/IASW has occurred; most likely due to SEU • A few cases of failure to restore context after DFEE switch-off has occurred (one recent case during December eclipse season was quickly corrected by MOC) SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 3

  4. Detector performance (is stable and unchanged) • Anomaly I • Degradation (loss of anode strips) of detector micro-strip due to heavy cosmic ray nuclei • Action: • Reduce HV from 900V to 820V, reducing the gain from ~1500 to ~600 • Use only one JEM-X unit at a time for the nominal mission • Impact: • Lower sensitivity in the ~3 to ~4 keV range • One unit only provides lower sensitivity for weak sources • Anomaly II • Steady increase of detector gain over time due to ion drift in glass substrate • Action: • Reduce HV one step (10 V) when needed to maintain constant gain within +- 10% • Impact: • Slowly degrading energy resolution • Slow change of spatial gain map • Operational inconvenience SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 4

  5. Status of the microstrip anodes Six anodes have been lost since JEM-X1 was reactivated in March 2004. We do not expect a similar loss rate in the future since three of these anodes were in a weak group already in Nov.-Dec. 2002. JEM-X1 February 2003 JEM-X1 March 2004 JEM-X1 January 2005 SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 5

  6. JEM-X detector gain increase (ageing) • Both units show increase of gain of ~1% per orbit of use (HV on) relative to the original gain  relative gain increase slows down to ½% per orbit after 100 orbits and to 1/3% after 200 orbits of use • Slow-down of gain increase in JEM-X1 due to lower temperature is inconclusive, but average lowering of detector tempeture is only ~2.5C • Lower temperature may slow down degradation of energy resolution DV corrected gain JEM-X2 JEM-X1 DV corrected gain Actual gain SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 6

  7. Temporary gain recovery • After extended period of HV-off the gain returns to its original value (the charge configuration is restored) • However, accelerated ”ageing” to a stable state then occurs over a period of 10-20 hours • Activation of dormant unit for science use should take this effect into account • Also impact on data taken after extended period of solar activity (like Jan 2005, where HV was off for 1 week) SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 7

  8. Detector resolution evolution • The energy resolution is slowly degrading (slower in JEM-X1 than in JEM-X2) • The resolution of JEM-X1 is now 10.5% @ 22 keV compared to 9% just after launch • The resolution of JEM-X2 is now about 12% @ 22 keV • The gain evolution may be slightly non-uniform over the plate, causing a slow drift in the spatial gain map • The spatial gain map is monitored by the Xe flourecense background line at 30 keV JEM-X1 JEM-X2 SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 8

  9. JEM-X HV setting • Due to ”frequent” lowering of the HV setting to keep a constant gain the HV value is now set by ISOC • However, a conservative HV setting must be kept in the MOC DB to avoid high gain after manual recovery • Responsibility of the instrument team to plan ahead and coordinate with MOC DB updates Example of JEM-X gain after recovery performed where the MOC DB contained ”old” HV setting SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 9

  10. JEM-X IREM Reaction is disabled • Experience shows that JEM-X internal radiation protection logic works well • Software switch-off mechanism only active when in data taking (but that is almost always the case) • Hardware switch-off mechanism always active • Using IREM may cause loss of science time • Conclusion: disable JEM-X reaction to IREM (OCR #183 implemented) Example of ”normal” IREM induced HV-off about 5-10 min before internal JEM-X mechanism would have triggered. SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 10

  11. Correlation of the JEM-X background rate and ground based cosmic ray monitor data from Oulu • The JEM-X noise count rate has grown by 40 % since the start of the mission. • The increase is closely correlated with the cosmic ray activity as measured by ground based neutron monitors. JEM-X Oulu SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 11

  12. Expected evolution of the background What about IBIS and SPI ? Oulu 40 years cosmic ray history The prediction is that the JEM-X rate will increase by another 20-40% as the Solar minimum evolves JEM-X/INTEGRAL 2 years SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 12

  13. Dither pattern • HEX dither is preferred when continuous JEM-X coverage is important • 5x5 dither does not provide continuous coverage and vignetting far off-axis is still not completely modeled • Staring observations introduce artifacts in the imaging and is discouraged • Artifacts in HEX and 5x5 observations may be further reduced by not exactly repeating the pointing pattern (suggested scheme from Niels Lund) SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 13

  14. Moving the center point for hex dithers Original center point Additional center point positions 120’ 40’ 72’ Original dither points SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 14

  15. Sensitivity gain by operating both JEM-X units:improvement for (isolated) weak sources • Assumptions: 100 counts per TM packet, 30 c/s background per unit, 1 Crab is 125 c/s, 7 science TM packets per 8 sec • 2 gain below ~110 mCrab total source flux, no gain above 460 mCrab • For allocation of 10 science TM packets, 2 gain below ~260 mCrab, no gain above 760 mCrab • General improvement of imaging by reduction of artifacts • Detector ageing increases by a factor of 2 10 science TM 7 science TM SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 15

  16. Conclusions • The JEM-X performance has been nominal, aside from the ”ageing” of the micro-strip substrate described above • Operations have been smooth, with efficient and competent monitoring and speedy recovery actions at MOC, keeping the loss of observing time to an absolute minimum • The planning at ISOC has been efficient and the support for the Observers Manual has been strong • The monitoring of the science TM by the ISDC operators has been helpful and the extra support for the JEM-X Instruments Station has been much appreciated • The handling of ”change requests” has been very flexible and great efforts have been put into finding ways of implementing the wishes of the JEM-X team • The Coordination Meeting has been an important forum for the Instrument Team to gain understanding of the different branches of the ground segment • JEM-X is ready to support the continued operations of INTEGRAL • Lesson learnt: Instrument team access to raw data should have been should have been included in the system design SDAST Meeting,March 2005 JEM-X Status Søren Brandt page 16