1 / 8

Common problems with draft applications

Common problems with draft applications. Technical review Shaikh A. Tayeb, Ph.D., P.E. DNREC-Air Quality Management Section October 8, 2008. Common problems with draft applications. COVER LETTER AQM FORMS ATTACHMENT. Common problems with draft applications. COVER LETTER

brent
Download Presentation

Common problems with draft applications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Common problems with draft applications Technical review Shaikh A. Tayeb, Ph.D., P.E. DNREC-Air Quality Management Section October 8, 2008

  2. Common problems with draft applications • COVER LETTER • AQM FORMS • ATTACHMENT

  3. Common problems with draft applications • COVER LETTER • Cover letter provides a short summary of the application • Identify the purpose of the construction permit • Identify the equipment to be permitted (new equipment, replacement equipment…..) • Identify PTEs • Identify proposed/restricted emissions (hrs of operations, fuel usage, annual throughput….) • New equipment added to the existing process: Identify and compare the existing PTEs and the new PTEs (increase or decrease emissions) • Identify if the application contains confidential information (follow procedure)

  4. Common problems with draft applications • AQM FORMS • Use the latest version of AQM forms AQM-1: Administrative information AQM-2: Process flow diagram AQM-3.1: Generic process equipment application All other AQM forms as applicable AQM-5: Emissions Information

  5. Common problems with draft applications • Form AQM-1: Administrative information (attached)

  6. Common problems with draft applications • Form 3.3: Generator/Engine application (attached)

  7. Common problems with draft applications • ATTACHMENT • Process flow diagram • Calculation Units, assumptions, AP-42, other emission factors… • Manufacturer’s spec • Discuss unit specific operating parameters • Screen modeling

  8. Common problems with draft applications • LINKS How to start Regulation No. 1102 permitting process http://www.awm.delaware.gov/Reg2/Pages/PermitProcess.aspx Air Quality Management Regulation No. 1102 Application Forms (to be used for Natural Minor and Synthetic Minor Permitting) http://www.awm.delaware.gov/Reg2/Pages/Reg2Intro.aspx Construction permit fee and fee calculator http://www.awm.delaware.gov/SiteCollectionDocuments/AWM%20Gallery/Reg2/Permit%20Fee%20Calculator.xls

More Related