An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monitoring project params VicaForogau grupa 244

  2. Project Monitoring and Control • The Monitoring and Controlling process oversees all the tasks and metrics necessary to ensure that the approved and authorized project is within scope, on time, and on budget so that the project proceeds with minimal risk.  • The Monitoring and Controlling process consists of those processes required to track, review and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.

  3. Project Monitoring and Control • Integrated change control • Scope Verification • Control (Scope, Time, Budget) • HR Management • Performance Reporting • Risk Management • Contract Administration

  4. Params • Scope • Time • Budget

  5. Scope

  6. Control Scope • Process of monitoring the status of the project and product scope and managing changes to the scope baseline.

  7. Time

  8. Control time • Process of monitoring the status of the project to update project progress and managing changes to the schedule baseline.

  9. Budget

  10. Control costs • Process of monitoring the status of the project to update project budget and managing changes to the cost baseline.

  11. Integrated Change Control

  12. HR Management

  13. Risk Management

More Related