1 / 17

Perth subsidence monitoring project

Funded by. Perth subsidence monitoring project. Mick Filmer 1 , Will Featherstone 1 , Andreas Schenk 2 & in conjunction with Landgate and ARC 1 Western Australian Centre for Geodesy, Curtin University 2 Geodetic Institute, Karlsruhe Institute of Technology, Germany

Download Presentation

Perth subsidence monitoring project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Funded by Perth subsidence monitoring project Mick Filmer1, Will Featherstone1, Andreas Schenk2 & in conjunction with Landgate and ARC 1Western Australian Centre for Geodesy, Curtin University 2Geodetic Institute, Karlsruhe Institute of Technology, Germany M.Filmer@curtin.edu.au; +61 8 9266 2582

  2. Vertical land motion (VLM) • Groundwater extraction results in VLM (usually subsidence) • Groundwater extraction in Perth increased ~1997 • Evidence of subsidence up to ~6 mm/yr from CGNSS Left panel: Subsidence of ~9 m between 1925 and 1977 in California. From Galloway & Burbey(2011)

  3. Why is it necessary to monitor VLM? • Risk of damage to physical infrastructure • Houses/buildings • Transport infrastructure • Distortion and changes of AHD heights – Landgate is mandated to supply accurate heights • Benchmarks on vertical datum (AHD) • Tide gauges in Earth-centred reference frame

  4. Heights change over time • AUSGeoid09 will not deliver AHD correctly, because benchmarks are moving vertically • HAHD = h – AG09fitted – Δht(φ,λ,t)

  5. Aims of the project • Quantify subsidence of the Perth Basin • including spatial and temporal variations • Combination of InSAR, CGNSS, repeat levelling • InSAR delivers high spatial resolution over large area • Develop vertical velocity model for Perth region • provide users with corrected transformation to AHD using GNSS • Correct tide gauge records for VLM • Fremantle is longest record in Southern Hemisphere

  6. Few knew that Perth was sinking • Lack of dedicated geodetic monitoring system – we need data! • Two CGNSS stations (only since ~1993) • Limited repeat GNSS observations • Little repeat levelling • Few archived InSAR images • 10 ERS • 12 Envisat I2 • 11 Envisat I3 • 21 ALOS PALSAR images, but cost $$$

  7. The status quo – a lot more required • Now three CGNSS stations • Extracted 1970s levelling (black) • Repeat levelling (red)

  8. GNSS - Gnangara • Subsidence correlates with increased water extraction • At this location for 1998-2012: • ~-5 cm height change • ~-25 m water level change Top panel: GPS ellipsoidal height (m) Bottom panel: Depth (m) of water in Yarragadee aquifer

  9. GNSS - Hillarys • Lots of discontinuities and noise in the time series • Complicates estimating VLM trends • Subsidence makes TG observed sea level rise appear faster Top panel: GPS at Hillarys (antenna is above sign) Bottom panel: GPS ellipsoidal height (m)

  10. InSAR introduction • Multiple radar images from repeat passes of the same satellite • Interferogram is formed by differencing images pixel-by-pixel • Multiple interferograms stacked to compute VLM time series Figure is of ALOS (Japanese Aerospace Exploration Agency) http://www.eorc.jaxa.jp/ALOS/en/about/palsar.htm

  11. InSAR preliminary results • Envisat I3 deformation map 2008-2009 • Contaminated by atmospheric signal • Short time-series (1 year) and only 11 InSAR images • PROBLEM: not enough data Envisat data provided by European Space Agency (ESA)

  12. InSAR preliminary results • TerraSAR-X deformation map Oct 2012-April 2013 • 12 images, but acquisitions continuing until end of 2013 • up to 36 images • not enough yet… TerraSAR-X data supplied by the German Space Centre (DLR) under GA-Curtin-Landgate-KIT science project

  13. VLM by levelling • Advantages • High precision – proven for detecting VLM • Repeatable along same traverse • Archived data can extend back over time of deformation – data available, but in hardcopy • Disadvantages • Low spatial resolution • Relatively slow – usually low temporal resolution

  14. Repeat levelling • Compare 1970s ΔH to 2011 re-levelled ΔH between Hillarys and Fremantle; Hillarys to Gnangara • E-W profile will compare 2013 re-levelling with 1970s ΔH • Re-levelling will be used to validate TerraSAR-Xand CGNSS time-series

  15. The outlook • Perth’s water shortage woes will continue, especially as our population increases • Monitoring of Perth’s subsidence needs serious and ongoing $$$ commitment over time • We need lots of good data over a long time period: • more CGNSS stations dedicated to VLM • more InSAR [long, well sampled time-series – large image stack] • Expand re-levelling program

  16. The outlook • Current project is funded by the Australian Research Council, Landgate, and Curtin University • Project ends December 2013 • Without additional funding, it will cease • Heights in Perth will degrade over time • Ongoing monitoring and solutions to the problem are dependent on the project continuing…

  17. Acknowledgements • We would like to thank • European Space Agency, German Space Agency, Landgate, Geoscience Australia and the WA Department of Water for supplying data • Australian Research Council, Landgate and Curtin University for project funding • Andy Hooper (StaMPS), TUDelft (Doris), JPL/Caltech (roi_pac) for freely available InSAR software • Nigel Penna (Newcastle University, UK)