Power Plant Piping Unit THIRUMAYAM makes a BEGINNING

Power Plant Piping Unit THIRUMAYAM makes a BEGINNING.

brian
Download Presentation

Power Plant Piping Unit THIRUMAYAM makes a BEGINNING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Plant Piping Unit THIRUMAYAM makes a BEGINNING

  2. a few specifics :Physical Despatches : 184.87 Metric Tonnes Number of DUs : 138 Number of Vehicles : 13 Projects Covered : 8Materials Processed : SA 106 Gr C, SA 335 P 22 & P 91 Significant Activities : Value Addition only by CORE PRODUCTION PROCESSES SELF INSPECTION MULTI-SKILL OPERATION

  3. our TEAM sincerely thank the following … CIVIL / FACTORY & TOWNSHIP (TMM) ; OP&C (FB) ; WRI ; CMC ; PC ; LOGISTICS ; PIPING CENTRE (E&C) ; WTC ; TOOL ENGINEERING ; MAINTENANCE & SERVICES ; ERP ; MANAGEMENT SERVICES INFORMATIC CENTRE ; MODERNISATION ; STORES ; C BC ; PURCHASE / CAPITAL EQUIPMENT - PSS - CP & SPARES ; FINANCE ; HRDC ; HRM ; HR - CANTEEN MANAGEMENT ; SSTP ; PR & ADMINISTRATION ; COMMUNICATIONS ; IT & S ; SECURITY & FIRE SERVICES ; SCMC ; FACILITY ENGG. ; VALVES ; ATP ; BOILER PRODUCTION (UNIT I & II) ; TELECOMMUNICATIONS ; LRP ; P & D ; MATERIAL PLANNING and TRANSPORT Departments … for the ARDENT SUPPORT & GUIDANCE for MAKING the START…..!